Laserfiche WebLink
Page 15 of 53 <br />(c) Construction performance reports. For the most part, onsite technical inspections and <br />certified percentage of completion data are relied on heavily by Federal awarding <br />agencies and pass -through entities to monitor progress under Federal awards and <br />subawards for construction. The Federal awarding agency may require additional <br />performance reports only when considered necessary. <br />(d) Significant developments. Events may occur between the scheduled performance <br />reporting dates that have significant impact upon the supported activity. In such cases, the <br />non -Federal entity must inform the Federal awarding agency or pass -through entity as <br />soon as the following types of conditions become known: <br />(1) Problems, delays, or adverse conditions which will materially impair the ability to <br />meet the objective of the Federal award. This disclosure must include a statement of <br />the action taken, or contemplated, and any assistance needed to resolve the situation. <br />(2) Favorable developments which enable meeting time schedules and objectives sooner <br />or at less cost than anticipated or producing more or different beneficial results than <br />originally planned. <br />Reclamation requires Performance reporting for all financial assistance awards, both <br />Construction and non -Construction. Performance reports for Construction agreements shall meet <br />the same minimum requirements outlined in 2 CFR 200.328(b)(2) above. <br />10.4 Report Frequency and Distribution. The following table sets forth the reporting <br />requirements for this Agreement. Please note the first report due date listed for each type of <br />report. <br />Required Reports <br />Interim Reports <br />Final Report <br />Performance Report <br />Format <br />No specific format required. See content <br />Summary of activities completed <br />requirements within Section 9.3 (2 CFR <br />during the entire period of <br />200.328) above. <br />performance is required. See <br />content requirements within Section <br />9.3 (2 CFR 200.328) above. <br />Reporting Frequency <br />Semi -Annual <br />Final Report due within 90 days <br />after the end of the period of <br />performance. <br />Reporting Period <br />October 1 through March 31 and April 1 <br />Entire period of performance <br />through September 30. <br />Due Date <br />Within 30 days after the end of the <br />Final Report due within 90 days <br />Reporting Period. <br />after the end of the period of <br />performance or completion of the <br />project. <br />Agreement No. R20AP00077 Agreement Template <br />(03/2019) <br />