Laserfiche WebLink
Page 15 of 52 <br />Reclamation requires Performance reporting for all financial assistance awards, both <br />Construction and non -Construction. Performance reports for Construction agreements shall meet <br />the same minimum requirements outlined in 2 CFR 200.328(b)(2) above. <br />10.4 Report Frequency and Distribution. The following table sets forth the reporting <br />requirements for this Agreement. Please note the first report due date listed for each type of <br />report. <br />Required Reports <br />Interim Reports <br />Final Report - <br />Performance Report <br />Format <br />No specific format required. See content <br />Summary of activities completed <br />requirements within Section 9.3 (2 CFR <br />during the entire period of <br />200.328) above. <br />performance is required. See <br />content requirements within <br />Section 9.3 (2 CFR 200.328) <br />above. <br />Reporting <br />Semi -Annual <br />Final Report due within 90 days <br />Frequency <br />after the end of the period of <br />performance. <br />Reporting Period <br />October 1 through March 31 and April 1 <br />Entire period of performance <br />through September 30. <br />Due Date <br />Within 30 days after the end of the <br />Final Report due within 90 days <br />Reporting Period. <br />after the end of the period of <br />performance or completion of the <br />project. <br />First Report Due <br />The first performance report is due for <br />N/A <br />Date <br />reporting period ending <br />September 30, 2020. <br />Submit to: <br />Grants Officer to LCFA@usbr.gov <br />Grants Officer to LCFA@usbr.gov <br />Federal Financial Report <br />Format <br />SF-425 (all sections must be completed) <br />SF-425(all sections must be <br />completed) <br />Reporting <br />Seai-Annual <br />Final Report due within 90 days <br />Frequency <br />after the end of the period of <br />performance. <br />Reporting Period <br />October 1 through March 31 and April 1 <br />Entire period of performance <br />through September 30. <br />Due Date <br />Within 30 days after the end of the <br />Final Report due within 90 days <br />Reporting Period. <br />after the end of the period of <br />performance or completion of <br />project. <br />Agreement No. R20AP00113 <br />Agreement Template <br />(03/2019) <br />