My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20E - AA AND AMENDMENT FOR SIDEWALK REPAIRS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
10/06/2020
>
20E - AA AND AMENDMENT FOR SIDEWALK REPAIRS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 12:00:56 PM
Creation date
10/1/2020 11:58:40 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20E
Date
10/6/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Amend Construction Contract with EBS General Engineering Services, Inc. for Concrete Repairs <br />October 6, 2020 <br />Page 2 <br />this reduces the potential of liability claims and assists in complying with regulations set forth by <br />the Americans with Disabilities Act. Procedures to mitigate these conditions include, offset <br />grinding, temporary asphalt ramping, and removal/replacement of damaged concrete areas. <br />On June 30, 2020, the City Manager authorized the award of a contract to EBS General <br />Engineering Services Inc. (EBS) for a concrete replacement project of various damaged sidewalks, <br />curbs, gutters, and driveway approaches. Prioritization of work is focused on areas with the highest <br />concentration of needed repairs, with the intent of providing a proportionate level of service in each <br />of the City's six Council wards. The most recent concrete work was completed in the Heninger <br />and French Park neighborhoods with upcoming projects slated for North Windsor Park, Windsor <br />Park, West Grove Valley, Thornton Park, Fairbridge Square, and Park Santiago neighborhoods <br />(Exhibit 1). <br />In order to deliver these additional sidewalk concrete improvements promptly, capitalize on the <br />existing favorable pricing of the existing contract with EBS (Project No. 20-6970), and assist the <br />City in meeting its annual Maintenance of Effort obligation, staff recommends increasing the <br />construction administration amount by $50,000 and project contingencies by $550,000 for a new <br />estimated project delivery cost of $850,470 (Exhibit 2). The $500,000 allocated to sidewalk <br />improvements during the budget process will be programmed to complete additional projects. <br />Following the completion of these improvements, a similar sidewalk replacement project will be <br />developed in accordance with the Public Works Agency, Maintenance Services Division, Omnibus <br />Concrete / Sidewalk Improvement Program, with a construction completion goal of Spring 2021 <br />(Exhibit 3). <br />FISCAL IMPACT <br />Approval of the requested Appropriation Adjustment will carry forward Fiscal Year 2019-20 Special <br />Gas Tax funds in the amount of $275,000 in the Special Gas Tax, Prior Year Carry Forward <br />revenue account (No. 02917002-50001) and appropriate the same amount to the Special Gas Tax, <br />Contract Services -Professional expenditure account (No. 02917660-62300). Funds are budgeted <br />and available for expenditure as follows: <br />Accounting <br />Fund <br />Accounting Unit, <br />Fiscal Year <br />Unit -Account # <br />Description <br />Account Description <br />Amount <br />(Project No.) <br />ORIGINAL CONSTRUCTION DELIVERY COST <br />Roadway Maintenance, <br />FY 2020-21 <br />029 17660-6 <br />17660-62300 <br />Special Gas Tax <br />Contract Services - <br />$250,470 <br />Professional <br />ADDITIONAL FUNDS <br />01117626-66220 <br />Public Works -Sidewalks, <br />FY 2020-21 <br />(20-6970) <br />General Fund <br />Improvements Other <br />$500,000 <br />Than Building <br />20E-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.