My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WRIGHT CONSTRUCTION ENGINEERING CORP.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
WRIGHT CONSTRUCTION ENGINEERING CORP.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2022 9:26:41 AM
Creation date
10/9/2020 12:16:36 PM
Metadata
Fields
Template:
Contracts
Company Name
WRIGHT CONSTRUCTION ENGINEERING CORP.
Contract #
P 21-6459
Agency
Public Works
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />INSTRUCTIONS TO BIDDERS <br />PROJECT NO.: 21-6459 <br />DYER RD STORMDRAIN REPAIR EXHIBIT A <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: Wright Construction Engineering Corp <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with said <br />plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following <br />schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />I <br />Dyer Rd Stonndrain Repair <br />I <br />LS <br />$ <br />62,440.00 <br />$ <br />62,440.00 <br />TOTAL BID <br />$62,440:00 <br />The lowest responsible bidder shall be selected based on the total base bid. The City reserves the <br />right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any). <br />* The quantity for this bid item is shown for bid comparison only. This bid item shall not be <br />subject to the " 25%" limit as stated in Section 3-2 of the Standard Specifications. The actual <br />amount for this item will be dictated by the actual quantity used, and the Agency reserves the <br />right to increase or decrease the quantity of this item accordingly. <br />t This bid item is considered a Specialty Item per Section 2-3.2 of the Standard Specifications. <br />TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGE <br />The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown <br />above, within twenty (20) working days after the commencement date stated in the Notice to <br />Proceed. <br />The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard <br />Specifications, shall be $750 per calendar day. <br />P- I of P-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.