Laserfiche WebLink
at 5A.1'T,I <br />3 <br />C/k.ONj <br />CITY OF SANTA ANA <br />PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Project Number 2111'6459; Change Order Number 1 <br />Dyer Road Stormdrain Repair <br />To Wright Construction Engineering Corp. Contractor <br />You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br />specifications on this contract. <br />NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br />Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br />Change requested by PUBLIC WORKS AGENCY <br />EXTRA WORK AT AGREED PRICE <br />1. Remove existing natural soil and import a new class II base to AGREED PRICE = <br />support the Stormdrain Pipes per PCO#01. $5,415.09 <br />2. Install addition asphalt concrete to match existing pavement section AGREED PRICE = <br />per PCO#02 $7,086.71 <br />TOTAL AGREED PRICE = $12,501.80 <br />Page 1 of 2 <br />