My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT FOR SECURITY SYSTEMS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
10/20/2020
>
25C - AGMT FOR SECURITY SYSTEMS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2020 3:09:10 PM
Creation date
10/14/2020 2:59:33 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Police
Item #
25C
Date
10/20/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Docu5i9n Envelope ID: 994D7B04-A6E8-44B9-B853-2D49ACC73F7A <br />SIEMENS <br />rt��ui%-f nr G f e <br />4. PAAL- InstallationofvideosecurityforthePAALfacility. Indoor substation camera, general <br />indoor camera and exterior building surveillance shall be provided in base bid. $ 34,654.00 <br />5. City Council Chamber Entrance- General outdoor and plaza security surveillance shall be <br />provided. Rear parking structure camera, included in base bid. $ 30,396.00 <br />6. City Hall- Remove and replace current City Hall storage workstation. Move monitoring location <br />to new security office. Upgrade 8 cameras with new digital cameras (media converters). <br />Existing cabling to be utilized. $ 47,073.00 <br />7. Central Library- Installation of three new cameras for inclusion in Library coverage (outdoor-2, <br />indoor-1). $ 6,500.00 <br />2. Period of Performance <br />SOW Start Date: November 01, 2020 <br />SOW Completion Date: December 31, 2021 <br />3. Key Personnel: <br />5.1 The following are the primary contact persons for the Parties in this SOW: <br />Role - <br />Resource Name _ <br />Phone <br />Email <br />Project Manager <br />Mark Tarasiak <br />Solutions Architect <br />David Engel <br />_ <br />Systems Engineer <br />Ismael Ortiz <br />Field Engineer <br />Rob Gaber <br />Project Coordinator <br />Kimberlie Paige <br />4. Delineated SOW and Budgets: <br />25C-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.