My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE - 75A
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
10/20/2020
>
CORRESPONDENCE - 75A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2020 3:42:17 PM
Creation date
10/19/2020 12:34:28 PM
Metadata
Fields
Template:
City Clerk
Date
10/20/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PALMIERI <br />HENNESSEY <br />LEIFER, LLP <br />Honorable Mayor and City Councilmembers of <br />the City of Santa Ana <br />October 20, 2020 <br />Page 6 <br />The reliance on the 2010 FIR and the deficient Addendum is not sufficient. <br />The 2010 EIR was not a project specific FIR. Rather, the 2010 EIR analyzed the then - <br />proposed Transit Zoning Code. The 2010 EIR did not consider this project. hi fact, the only <br />development proposal included in the project description of the 2010 FIR was in a different area <br />of the City of Santa Ana. (See 2010 FIR, Figure 3-7.) In fact, as described in the 2010 EIR <br />project description, the Transit Zoning Code was initially drafted as part of a Specific Plan, <br />however, the City tabled the Specific Plan and instead proceeded with "the zoning component." <br />The 2010 EIR project description states, "The Transit Zoning Code embodies many of the <br />policies previously contained within the [specific plan], but is more limited in its scope of <br />implementation." (Id., at p. 3-13.) <br />The 2010 FIR did not include a site specific analysis of this proposed Project. Indeed, <br />the City recognized and acknowledged that the 2010 EIR "can be characterized as both a <br />program FIR and a project-EIR." The "project-EIR" component related to the development <br />proposal (Figure 3-7) for another area in the City: "since adequate level of details is available <br />for the development proposal, this EIR analyzes the project's specific potential impacts." (Id. at <br />p. 3-28.) <br />The City further recognized that further detailed analysis would be required for individual <br />projects: "Regardless of its title, the document is intended to act as an analytical superstructure <br />for subsequent, more detailed analyses associated with individual project applications <br />consistent with the proposed project." (Ibid. [emphasis added].) Even more direct, in the <br />2010 EK the City stated: "The City recognizes that the program -level analysis of the <br />remainder of the project does not include the level of detail necessary to qualify as a proiect <br />FIR, and anticipates that future projects will require more detailed environmental review at <br />the time they are proposed." (Ibid at p. 3-28.) <br />The proposed Project's reliance on the 2010 FIR and the cursory "analysis" provided in <br />the Addendum do not provide a "more detailed environmental review." Indeed, as discussed <br />above, many of the development standards that were considered in the 2010 EIR and adopted in <br />the Transit Zoning Code are being ignored without any consideration or analysis of the impact of <br />such deviations on the environment. <br />The Proiect will have a significant impact on Cultural Resources that has not been <br />adequately analyzed: The Project proposes a massive development just a few feet away from <br />one of the historic buildings in the City of Santa Ana —the Spurgeon Building. In order to make <br />way for the mixed -use development proposed, the Project proposes to remove the existing <br />parking structure including the bridge and appurtenances that connect to buildings that front on <br />
The URL can be used to link to this page
Your browser does not support the video tag.