My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CWE
Clerk
>
Contracts / Agreements
>
C
>
CWE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2022 5:32:07 PM
Creation date
10/28/2020 1:59:49 PM
Metadata
Fields
Template:
Contracts
Company Name
CWE
Contract #
A-2020-205-02
Council Approval Date
10/20/2020
Expiration Date
10/19/2023
Insurance Exp Date
12/1/2022
Destruction Year
2028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Steven Bell, PE, ENV SP, CFM, QSD <br />Steven Bell is a professional civil engineer with a <br />specialization in water resource engineering. He has over 15 <br />years of professional experience performing hydrologic and <br />hydraulic analyses, flood mapping and drainage reports. He <br />has prepared reports on behalf of private, state, local, and <br />tribal clients in order to achieve compliance with regulations. <br />In addition, Steven has developed plans for reconstruction of <br />roadways and stormwater conveyance facilities for several <br />municipalities in Oklahoma. <br />RELEVANT EXPERIENCE <br />City of San Fernando Regional Park Infiltration Hydrology <br />and Hydraulics Support preparing hydrologic and hydraulic <br />studies for the San Fernando Regional Park, which consists <br />of installing an underground manufactured infiltration system, <br />and removing/replacing the existing baseball field and <br />irrigation system. The infiltration system will serve a <br />drainage area greater than 400 acres and recharge <br />groundwater sources with approximately 200 acre-feet of <br />stormwater annually. The system has a single storm capture <br />Years of Experience <br />15 <br />Education <br />MS, Civil Engineering, 2006, <br />University of Oklahoma <br />BS, Civil Engineering, 2004, <br />University of Oklahoma <br />Registrations <br />Civil Engineer, CA, 81531 <br />Civil Engineer, OK, 24571 <br />EnvisionTM Sustainability <br />Professional Credential, <br />30283 <br />Certified Floodplain Manager, <br />US-19-11240 <br />Qualified SWPPP Developer, <br />C81531 <br />capacity greater than 24 acre-feet. Additional tasks include: I <br />utility and community coordination; conducting a preliminary design report; performing <br />environmental studies that meet CEQA requirements; obtaining LACFCD connection permits; <br />providing topographical surveys; conducting a geotechnical investigation report; developing a <br />plan for landscape and irrigation improvements; providing potholing services; preparing PS&Es; <br />preparing an O&M manual for proposed structural stormwater BMPs, pretreatment devices, and <br />stormwater infiltration system; and providing bid and construction support. <br />City of Bell Gardens John Anson Ford Park Infiltration Cistern Hydrology and Hydraulics <br />Support for developing design PS&Es for this urban runoff capture project. John Anson Ford <br />Park is located in the City of Bell Gardens and the project will help the City and the Lower Los <br />Angeles River Upper Reach 2 Watershed Management Group meet its NPDES MS4 Discharge <br />requirements. The project will capture dry -weather and storm runoff from a highly industrialized <br />urban catchment area of 2,295 acres. The project is anticipated to provide compliance with <br />existing water quality objectives for the entire Rio Hondo watershed portion of the LAR UR2 <br />WMA. Tasks include: modeling using SWMM, EPA-SWMM, WSPG, and XP-WSPG, and <br />providing QA/QC on hydrologic and hydraulic calculations. Additional tasks include conducting <br />a geotechnical field analysis, utility search, topographic mapping, preparation of design PS&Es. <br />
The URL can be used to link to this page
Your browser does not support the video tag.