Laserfiche WebLink
(:WE* <br />Kayla Kilgo, PhD, EIT, ENV SP <br />Dr. Kayla Kilgo has over five years of professional experience <br />MEL... <br />modeling riverine systems using software, such as HEC-HMS <br />Years of Experience <br />and HEC-RAS, for floodplain management. Kayla is currently <br />5 <br />providing calculations for the City of Los Angeles LA River <br />Education <br />Bikeway and Greenway project, which converts an existing <br />12-mile-long maintenance road along the Los Angeles River <br />PhD Philosophy, <br />Environmental Engineering <br />into a greenway, which includes a Class I Bicycle Path. Her <br />and Science, Clemson <br />additional experience includes assisting with Environmental <br />University <br />Site Assessments (ESAs), drafting site -specific drawings for <br />MS, Environmental <br />environmental compliance documents, and writing <br />Engineering, University of <br />environmental permits, compliance reports, and BMP plans. <br />Alabama <br />RELEVANT EXPERIENCE <br />BS, Civil Engineering, <br />University of Alabama <br />San Gabriel Valley Council of Governments Rio Hondo <br />Registrations <br />Load Reduction Strategy Preliminary Engineering and <br />Engineering -in -Training, CA, <br />Final Design Services Assistant Engineer preparing a <br />9 9� P P 9 <br />166344 <br />feasibility assessment and preliminary design for three <br />ENVISIONTM Sustainability <br />diversion locations within Rio Hondo Los Angeles River <br />Professional Credential, <br />watershed in compliance with the Municipal Separate Storm <br />30368 <br />Sewer (MS4) Permit requirements. The three diversion areas <br />include Alhambra Wash, Eaton Wash, and Rubio Wash. <br />Tasks include: coordination with the Los Angeles County Sanitation Districts (LACSD) to verify <br />discharge allowed to the sanitary sewers in the area, detailed flow analysis and coordination <br />with the LACSD and watermaster, environmental evaluation and documentation, site field <br />investigation, topographic survey for each site, utility search to identify existing or planned utility <br />conflicts, geotechnical evaluation to identify soil characteristics and infiltration capacity for each <br />site, permits and easement evaluation, preliminary operations and maintenance, and <br />preparation of a feasibility assessment report and preliminary design plans. <br />City of West Hollywood Beverly and Robertson Boulevards Complete Street Staff <br />Engineer providing calculations and design for a project intended to improve mobility and <br />pedestrian safety by adding 10,000 square feet of impervious surface within the public right-of- <br />way. The project also includes widened sidewalks, bulb -outs at all intersections and planters <br />with directional pedestrian ramps at crosswalks, roadway paving with sharrow bicycle route <br />markings, street tree planting, parkway planting using drought -tolerant groundcover, street <br />lighting, and pedestrian -level street lighting. Tasks include PS&Es, topographic surveying to <br />produce the base map, utility research of substructures in the vicinity of the work, and plan <br />approval by jurisdictional agencies for catch basin, fire hydrant, and street light relocations. <br />