My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SANTEC CONSULTING SERVICES, INC.
Clerk
>
Contracts / Agreements
>
S
>
SANTEC CONSULTING SERVICES, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 8:54:00 AM
Creation date
10/28/2020 2:09:05 PM
Metadata
Fields
Template:
Contracts
Company Name
SANTEC CONSULTING SERVICES, INC.
Contract #
A-2020-205-03
Council Approval Date
10/20/2020
Expiration Date
10/19/2023
Insurance Exp Date
10/1/2024
Destruction Year
2028
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Professional Staff <br />Principal Engineer/Geologist/Environmental ScientisttCertified Industrial Hygienist....,......__. _.___._.__...____ <br />$ <br />195 <br />Senior Engineer/GeologisUEnvironmental Scientist.... .._. ...._. _. __.... <br />_.._._... $ <br />190 <br />Senior Project Engineer/Geologist/Environmental Scientist .. _...... _.. __. __._. <br />.___....__ $ <br />185 <br />Project Engineer/GeologisttEnvironmental Scientist.._ _... .__ _._. _,... <br />_...,. _,._ $ <br />175 <br />Senior Staff Engineer/Geologist/Environmental Scientist _..... _._. __.,. ._.... _. <br />_., ..... .., $ <br />150 <br />Staff Engineer/GeologisUEnvironmental Scientist ..... . ..... .... ___.,. ......___ <br />.......... ...... $ <br />145 <br />GISAnalyst.. ............ _.._.. _. _........... ... .........._,.. _................ ... _....... <br />... __...____. $ <br />125 <br />Technical Illustrator/CAD Operator .,...... _.............. .. ............. ......_...... ______. <br />__._.. $ <br />103 <br />Field Staff <br />Certified Asbestos/Lead Technician. __. __....__.. <br />... ... $ <br />185 <br />Field Operations Manager. .. _.. _. __......... ........._ _. ... .._ <br />_... $ <br />125 <br />Nondestructive Examination Technician (UT, MT, LP) ............. ..._ <br />_.. $ <br />119 <br />Supervisory Technician ......_ _ _. _. _.. <br />... $ <br />115 <br />Special Inspector (Concrete, Masonry, Structural Steel,Welding, and Fireproofing).___._..... .._._.. <br />._....__.. $ <br />log <br />Senior Technician. __........_ <br />.....__.. $ <br />108 <br />Technician.,_. .__. _.. __._. <br />.. ........,. $ <br />103 <br />Administrative Staff <br />Information Specialist......_ ......._._.. .__...__ _ <br />-$ <br />85 <br />Geotechnical/Environmental/Laboratory Assistant...... __._ _. _.. _. _..._ <br />.___ _.. __. $ <br />80 <br />Data Processor _................. ........... ... _.. _._._ __. <br />......._. _._ $ <br />75 <br />Concrete Coring Equipment(includes technician)........... ____. <br />_. _.. __.._ _. ... $ <br />190/hr <br />Anchor Load Test Equipment(includes technician)._..... _. _.. _.. <br />.,___.. .__. __ _... _. $ <br />190/hr <br />GPREquipment .... ___. .......... .. .__ <br />_. . .__. ..... $ <br />180/hr <br />Inclinometer...._ _.. __ .__._. ___. . ....__. <br />__..._ _ _..._. _... ....... $ <br />100/hr <br />Hand Auger Equipment........ __.__. ___.... _._.__.. <br />__..... _.__. __._.. $ <br />80/hr <br />Reber Locator(Pachometer). ___. .__._ _._.... <br />_,_.,. _. ..__.,... $ <br />25/hr <br />Vapor Emission Kit __...._ ____ _...__. ____ <br />_. ____ $ <br />65/kit <br />Nuclear Density Gauge __... .._. .. ._ _._._. <br />$ <br />12/hr <br />X-Ray Fluorescence .... ... ..... ....__.. ... .._....,_.. ....... <br />__.._ _.._ .. .._.. $ <br />70/hr <br />PID/FID..___... .. _..._. .. ....... . .... <br />_..... $ <br />25/hr <br />Air Sampling Pump ....__. ..__. .. . __...... ...._.. <br />___. ... .. ___.. $ <br />10/hr <br />Field Vehicle _. __..... __..... <br />_..._ .. $ <br />15/hr <br />Expert Witness Testimony..._ _._.... _.._ _. ... ._. <br />__.._. _._.. .. $ <br />450/hr <br />Direct Expenses _. _ __.. .. .__.. _._ <br />.._.._. _. _. _._.. Cost plus <br />15% <br />Special equipment charges will be provided upon request. <br />III . - <br />For field and laboratory technicians and special inspectors, overtime <br />rates at 1.5 times the regular rates will be charged <br />for work performed in excess of 8 hours in one day Monday through <br />Friday and all day on Saturday. Rates at twice the <br />regular rates will be charged for all work in excess of 12 hours in one day, all day Sunday and on holidays. <br />Field technician and special inspection hours are charged at a 4-hour <br />minimum, and 8-hour minimum for hours exceeding <br />4 hours. <br />Invoices are payable upon receipt. A service charge of 1.5 percent per month may be charged on accounts not paid <br />within 30 days. <br />Our rates will be adjusted in conjunction with the increase in the Prevailing Wage Determination during the life of the <br />project, as applicable. <br />The terms and conditions are included in Ninyo & Moore's Work Authorization and Agreement forth. <br />Ninyo&Moore I Santa Ana Stormwaler Project Design I SO4-02926I August 12, 2020 CA13 <br />® Stantec Stanlec - Proposal for On -Call Slormwater Project Design Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.