Laserfiche WebLink
Leading the Way Through Superior Client Service, Innovation, and a Commitment to Excellence <br />Westland Group 2020 Prevailing Wage Rates <br />Professional Services Fee Schedule effective through December 31, 2020 <br />OFFICE SERVICES <br />Principal............................................................................................................................................ <br />$215/hr <br />Senior Project Manager.................................................................................................................... <br />$195/hr <br />ProjectManager............................................................................................................................... <br />$175/hr <br />CA/QC Specialist............................................................................................................................... <br />$175/hr <br />Project Engineer/Surveyor/Senior Designer..................................................................................... <br />$155/hr <br />Designer/Staff Engineer.................................................................................................................... <br />$130/hr <br />Mapping/Survey/GIS Analyst............................................................................................................ <br />$120/hr <br />Mapping/Survey/Engineering/GIS Technician.................................................................................. <br />$115/hr <br />Administration...................................................................................................................................$ <br />85/hr <br />EngineeringAide/Intern.....................................................................................................................$ <br />75/hr <br />FIELD SERVICES <br />1-Man Survey Crew with Equipment................................................................................................ <br />$180/hr <br />2-Man Survey Crew with Equipment................................................................................................ <br />$285/hr <br />3-Man Survey Crew with Equipment................................................................................................ <br />$335/hr <br />Hourly rates for field crews include normal usage of field equipment and are fully equipped rates, including <br />vehicle. <br />There is a four (4) hour minimum call out. <br />REIMBURSABLE EXPENSES <br />Mileage incurred by office employees is charged at current IRS rates. Out of town stays will be billed at cost per <br />person per night with client approval. Prints, maps, documents, messenger service, air travel, rental equipment, <br />and other direct expenses (material/supp(ies) will be charged at cost plus 10%. The services of outside consultants <br />will be charged at cost plus 15%. <br />ENGINEERING j GEOSPATIAL j LAND PLANNING <br />