My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-10-20_AGENDA PACKET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2020
>
02-10-20
>
02-10-20_AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2020 9:19:45 PM
Creation date
11/9/2020 9:17:50 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resolution No. 2020-xx <br />Page 6 of 9 <br />EXHIBIT A <br /> <br />Conditions of Approval for Conditional Use Permit No. 2019-21 <br /> <br />Conditional Use Permit No. 2019-21 for after-hours operations is approved subject to <br />compliance, to the reasonable satisfaction of the Planning Manager, with applicable <br />sections of the Santa Ana Municipal Code, the California Administrative Code, the <br />California Building Standards Code, and all other applicable regulations. In addition, the <br />Applicant shall meet the following conditions of approval: <br /> <br />The Applicant must comply with each and every condition listed below prior to exercising <br />the rights conferred by this conditional use permit. <br /> <br />The Applicant must remain in compliance with all conditions listed below throughout the <br />life of the conditional use permit. Failure to comply with each and every condition may <br />result in the revocation of the conditional use permit. <br /> <br />1. All proposed site improvements must conform to Development Project Review (DP) <br />No. 2018-08 and the staff report exhibits. <br /> <br />2. Any amendment to this conditional use permit must be submitted to the Planning <br />Division for review. At that time, staff will determine if administrative relief is <br />available or if the conditional use permit must be amended. <br /> <br />3. Prior to the issuance of a building permit, a full landscape and irrigation plan is to be <br />submitted for review and approval. The landscape plan shall conform to the <br />commercial landscape standards, Citywide Design Guidelines, and the City’s Water <br />Efficient Landscape Ordinance. All utilities shall be properly screened, and the <br />proposed trash enclosure shall be screened by a four (4) foot high landscape <br />hedge and incorporate vines. The plan shall also incorporate a row of Italian <br />cypress trees, or similar species to be planted along the southern perimeter of the <br />property to provide additional screening to the residential uses to the south <br />(Modified by staff on February 10, 2020). <br /> <br />4. Prior to issuance of a building permit for the structures, the existing perimeter wall <br />shall be increased to seven feet in height. (Added by staff on February 10, 2020). <br /> <br />5. All existing and new perimeter walls shall be painted or coated in anti-graffiti <br />coating, and vines shall be planted along all such walls. <br /> <br />6. To deter loitering and illegal dumping, the landscape plan shall include dense <br />landscaping and a minimum five (5) foot tall wrought iron fence at the southeast <br />corner of the subject site between the southerly edge of the building and the <br />southern property line. <br /> <br />7. The location of the trash enclosure and the air/water machine must be designed to <br />minimize any potential impacts to the residential uses to the south of the subject <br />1 - 32
The URL can be used to link to this page
Your browser does not support the video tag.