My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5 1109 N BROADWAY
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2020
>
03-30-20 Special Meeting
>
5 1109 N BROADWAY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2020 9:33:47 PM
Creation date
11/9/2020 9:31:36 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
O NE B RO A D WA Y P LA Z A P RO J E CT E I R A D DE N DU M CI T Y O F S A NT A A NA <br />5. Environmental Analysis <br />March 2020 Page 29 <br />term pollution; however, the Approved Project’s emissions of NOx would remain significant and unavoidable. <br />The Approved Project would found to result in a less than significant impa ct to CO emissions (local air quality). <br />The Certified EIR found that the Approved Project is consistent with the South Coast Air Quality Management <br />Plan. <br />The Initial Study for the Certified EIR determined that the Approved Project would not result in the significant <br />amounts of objectionable odors or create an adverse effect. A less than significant impact would occur. <br />5.3.2 Impacts Associated with the Proposed Project <br />Where available, the significance criteria established by the applicable air quality management district or air <br />pollution control district may be relied upon to make the following determinations. Would the project: <br />Environmental Issues <br />Substantial Change in Project Requiring <br />Major EIR Revisions <br />Substantial Change in Circum-stances Requiring <br />Major EIR Revisions <br />New Information Showing New or Increased <br />Significant Effects <br />Less Than Significant <br />Impact/No Changes or New Information Requiring <br />Preparation of an EIR No Impact <br />a) Conflict with or obstruct implementation of <br />the applicable air quality plan? x <br />b) Result in a cumulatively considerable net <br />increase of any criteria pollutant for which <br />the project region is non-attainment under <br />an applicable federal or state ambient air <br />quality standard? <br /> x <br />c) Expose sensitive receptors to substantial <br />pollutant concentrations? x <br />d) Result in other emissions (such as those <br />leading to odors) adversely affecting a <br />substantial number of people? x <br /> <br />Methodology <br />Urban Crossroads prepared a memorandum reviewing Air Quality and Greenhouse Gas Emissions for the <br />Proposed Project (AQ/GHG Memo). The AQ/GHG Memo is contained in Appendix A. Emissions for the <br />Proposed Project were calculated employing the California Emissions Estimator Model (CalEEMod) version <br />2016.3.2. <br />Comments: <br />a) Conflict with or obstruct implementation of the applicable air quality plan? <br />Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR. <br />Air quality in Orange County is regulated by SCAQMD, which is the agency principally responsible for <br />comprehensive air pollution control in the South Coast Air Basin (SoCAB). The SCAQMD develops rules and <br />5 - 83
The URL can be used to link to this page
Your browser does not support the video tag.