My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-11-20_AGENDA PACKET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2020
>
05-11-20
>
05-11-20_AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2020 9:57:00 PM
Creation date
11/9/2020 9:54:30 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />The Bowery Mixed-Use Project 4. Mitigation Monitoring and Reporting Program <br /> <br /> <br />City of Santa Ana 4-3 <br />Final EIR <br />May 2020 <br />TABLE 4-1: MITIGATION MONITORING AND REPORTING PROGRAM <br />THE BOWERY MIXED-USE PROJECT EIR <br />Standard Condition/ Plan, Program, Policy / Mitigation Measure Timing <br />Responsible for <br />Ensuring Compliance / <br />Verification <br />Date Completed and <br />Initials <br />AIR QUALITY <br />Plan, Program, or Policy PPP AQ-1: SCAQMD Rule 403. The following <br />measures shall be incorporated into construction plans and specifications as <br />implementation of SCAQMD Rule 403: <br />o All clearing, grading, earth-moving, or excavation activities shall cease <br />when winds exceed 25 mph per SCAQMD guidelines in order to limit <br />fugitive dust emissions. <br />o The contractor shall ensure that all disturbed unpaved roads and disturbed <br />areas within the Project are watered at least three (3) times daily during <br />dry weather. Watering, with complete coverage of disturbed areas, shall <br />occur at least three times a day, preferably in the mid-morning, afternoon, <br />and after work is done for the day. <br />o The contractor shall ensure that traffic speeds on unpaved roads and <br />Project site areas are reduced to 15 miles per hour or less. <br />In Construction Plans and <br />Specifications. Prior to <br />Demolition and <br />Construction Permits <br />City of Santa Ana Building <br />Safety Division <br /> <br />Plan, Program, or Policy PPP AQ-2: SCAQMD Rule 1113. The following <br />measure shall be incorporated into construction plans and specifications as <br />implementation of SCAQMD Rule 1113. The Project shall only use “Low- <br />Volatile Organic Compounds (VOC)” paints (no more than 50 gram/liter of <br />VOC) consistent with SCAQMD Rule 1113. <br />In Construction Plans and <br />Specifications. Prior to <br />Construction Permits <br />City of Santa Ana Building <br />Safety Division <br /> <br />Plan, Program, or Policy PPP AQ-3: SCAQMD Rule 445. The following <br />measure shall be incorporated into construction plans and specifications as <br />implementation of SCAQMD Rule 445. Wood burning stoves and fireplaces <br />shall not be included or used in the new development. <br />In Construction Plans and <br />Specifications. Prior to <br />Construction Permits <br />City of Santa Ana Building <br />Safety Division <br /> <br />GEOLOGY AND SOILS <br />Plan, Program, or Policy PPP GEO-1: CBC Compliance. The Project is <br />required to comply with the California Building Standards Code (CBC) as <br />included in the City’s Municipal Code as Chapter 8, Article 2, Division 1, to <br />preclude significant adverse effects associated with seismic and soils hazards. <br />In Construction Plans and <br />Specifications. Prior to <br />Construction Permits <br />City of Santa Ana Building <br />Safety Division <br /> <br />3-92
The URL can be used to link to this page
Your browser does not support the video tag.