My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3 - The Bowery_NOTICE
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2020
>
05-11-20
>
3 - The Bowery_NOTICE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2020 9:59:34 PM
Creation date
11/9/2020 9:59:32 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
View images
View plain text
CITY OF SANTA ANA <br />Planning and Building Agency <br />20 Civic Center Plaza ● P.O. Box 1988 <br />Santa Ana, California 92702 <br />www.santa-ana.org/pba <br /> <br />NOTICE OF PUBLIC HEARING <br />BEFORE THE SANTA ANA PLANNING COMMISSION <br /> <br />The City of Santa Ana encourages the public to participate in the decision-making process. This notice <br />is being sent to those who live or own property within 500 feet of the project site or who have expressed <br />an interest in the proposed action. We encourage you to contact us prior to the Public Hearing if you <br />have any questions. <br /> <br />Planning Commission Action: The Planning Commission will hold a Public Hearing to receive public testimony, <br />and will take action on the item described below. Recommendation on this matter will be forwarded to the City <br />Council at a later date for final determination. <br /> <br />Project Location: 2300, 2310 and 2320 South Redhill Avenue located in the Light Industrial (M1) zoning <br />district. <br /> <br />Project Applicant: Jeremy Ogulnick, representing Arrimus Capital <br /> <br />Proposed Project: The applicant proposes to demolish three existing structures and redevelop the site with a <br />commercial and residential mixed -use development consisting of 80,000 square feet leasable of commercial <br />area, up to 1,100 residential units, 2,600 onsite parking sp aces, and onsite landscaping and amenities. In order <br />to facilitate the construction of the project, the applicant is requesting certification of Final Environmental Impact <br />Report (EIR) No. 2020-01 (SCH No. 2019080011), environmental findings of fact pursuant to the California <br />Environmental Quality Act, adoption of a Statement of Overriding Considerations, and adoption of a Mitigation <br />Monitoring and Reporting Program. Other land use entitlements requested include General Plan Amendment No. <br />2020-02 to redesignate the property from Professional and Administration Office (PAO) to District Center (DC) <br />to update text portions of the City’s Land Use Element to reflect this change in order to allow for development of <br />this project, and Amendment Application No. 2020 -01 to rezone the property from Light Industrial (M-1) to Specific <br />Development No. 96 (SD-96). <br /> <br />Environmental Impact: In accordance with the California Quality Environmental Act (CEQA), Environmental Impact <br />Report, Environmental Review No. 2020-01 was prepared for the project to analyze the potential impacts of the <br />project and identify measures to mitigate the environmental effects. The EIR concludes that the proposed project <br />would require mitigation related to Air Quality, Geology and Soils, Hazards and Hazardous Materials, Hydrology and <br />Water Quality, Transportation, and Tribal Cultural Resources. Impacts related to Air Quality, Greenhouse Gas <br />Emissions, and Transportation would remain significant and unavoidable after mitigation. <br /> <br />Meeting Details: This matter will be heard on Monday, May 11, 2020 at 5:30 p.m. Due to Governor Gavin <br />Newsom's Executive Order and the City Council's Proclamation of Local Emergency, we can no longer offer an <br />in-person meeting location for the community to attend public meetings. We are offering two remote ways to <br />view the meeting: YouTube or Live Stream. Please visit www.santa-ana.org/cc/city-meetings/virtual-meetings <br />for detailed information. <br /> <br />Written Comments: You may send your written comments to Sarah Bernal, Recording Secretary, by mail at <br />City of Santa Ana, 20 Civic Center Plaza – M20, Santa Ana, CA 92701 or via e -mail at ecomments@santa- <br />ana.org (reference ‘”Planning Commission”). Make sure to include your name, whether you are in support of or <br />in opposition to the item and why. Comments received by 5:00 p.m. on the day of the meeting will be distributed <br />to the Commission prior to the start of the meeting and will also be posted on our website at www.santa- <br />ana.org/cc/city-meetings. The Clerk will provide a summary report of the comments received on each
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).