Laserfiche WebLink
3.0 Construction Detail <br />Construction Phase <br />Phase <br />Number <br />Phase Name Phase Type Start Date End Date Num Days <br />Week <br />Num Days Phase Description <br />1 Demolition Demolition 6/1/2020 6/1/2020 5 1 <br />OffRoad Equipment <br />Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor <br />Demolition Concrete/Industrial Saws 0 8.00 81 0.73 <br />Demolition Excavators 0 8.00 158 0.38 <br />Demolition Rubber Tired Dozers 0 8.00 247 0.40 <br />Trips and VMT <br />Phase Name Offroad Equipment <br />Count <br />Worker Trip <br />Number <br />Vendor Trip <br />Number <br />Hauling Trip <br />Number <br />Worker Trip <br />Length <br />Vendor Trip <br />Length <br />Hauling Trip <br />Length <br />Worker Vehicle <br />Class <br />Vendor <br />Vehicle Class <br />Hauling <br />Vehicle Class <br />Demolition 0 0.00 0.00 0.00 14.70 6.90 20.00 LD_Mix HDT_Mix HHDT <br />ROG NOx CO SO2 Fugitive <br />PM10 <br />Exhaust <br />PM10 <br />PM10 <br />Total <br />Fugitive <br />PM2.5 <br />Exhaust <br />PM2.5 <br />PM2.5 <br />Total <br />Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e <br />Percent <br />Reduction <br />0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 <br />Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking Area: 0 (Architectural <br />Coating ±sqft) <br />Acres of Grading (Site Preparation Phase): 0 <br />Acres of Grading (Grading Phase): 0 <br />Acres of Paving: 11.26 <br />CalEEMod Version: CalEEMod.2016.3.2 Date: 2/5/2020 3:04 PMPage 7 of 17 <br />The Bowery Mixed-Use Project (Operations) - Orange County, Summer