Laserfiche WebLink
Project Characteristics - <br />Land Use - <br />Construction Phase - Consistent with DEIR's model. <br />Off-road Equipment - Consistent with DEIR's. <br />Fleet Mix - Consistent with DEIR's model. <br />Vehicle Emission Factors - See SWAPE comment about emission factors. <br />Vehicle Trips - Consistent with DEIR's model. <br />1.1 Land Usage <br />Land Uses Size Metric Lot Acreage Floor Surface Area Population <br />Industrial Park 212.12 1000sqft 4.87 212,121.00 0 <br />1.2 Other Project Characteristics <br />Urbanization <br />Climate Zone <br />Urban <br />8 <br />Wind Speed (m/s)Precipitation Freq (Days)2.2 30 <br />1.3 User Entered Comments & Non-Default Data <br />1.0 Project Characteristics <br />Utility Company Southern California Edison <br />2019Operational Year <br />CO2 Intensity <br />(lb/MWhr) <br />702.44 0.029CH4 Intensity <br />(lb/MWhr) <br />0.006N2O Intensity <br />(lb/MWhr) <br />The Bowery Mixed-Use Project (Existing Operations - Passenger Cars) <br />Orange County, Annual <br />CalEEMod Version: CalEEMod.2016.3.2 Date: 2/7/2020 10:19 AMPage 1 of 18 <br />The Bowery Mixed-Use Project (Existing Operations - Passenger Cars) - Orange County, Annual