Laserfiche WebLink
6.1 Mitigation Measures Area <br />6.0 Area Detail <br />5.3 Energy by Land Use - Electricity <br />Electricity <br />Use <br />Total CO2 CH4 N2O CO2e <br />Land Use kWh/yr MT/yr <br />Industrial Park 2.96757e <br />+006 <br />945.5323 0.0390 8.0800e- <br />003 <br />948.9149 <br />Total 945.5323 0.0390 8.0800e- <br />003 <br />948.9149 <br />Unmitigated <br />Electricity <br />Use <br />Total CO2 CH4 N2O CO2e <br />Land Use kWh/yr MT/yr <br />Industrial Park 2.96757e <br />+006 <br />945.5323 0.0390 8.0800e- <br />003 <br />948.9149 <br />Total 945.5323 0.0390 8.0800e- <br />003 <br />948.9149 <br />Mitigated <br />CalEEMod Version: CalEEMod.2016.3.2 Date: 2/7/2020 10:19 AMPage 12 of 18 <br />The Bowery Mixed-Use Project (Existing Operations - Passenger Cars) - Orange County, Annual