My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3 - The Bowery_PUBLIC COMMENT_RAMSEY
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2020
>
05-11-20
>
3 - The Bowery_PUBLIC COMMENT_RAMSEY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2020 10:02:45 PM
Creation date
11/9/2020 10:00:03 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Avion Project SEIR <br />Page S-9 <br />Table S-1 <br />Summary of Significant Environmental Impacts and Mitigation Measures <br />Environmental Issue Impacts Mitigation <br />Impact Level <br />After <br />Mitigation <br /> other wildlife surveys/survey schedules <br />(including USFWS protocol), timing of <br />surveys, wetland buffers, other impact <br />avoidance areas, and any subsequent <br />requirements determined by the Qualified <br />Biologist and the City Assistant Deputy <br />Director (ADD)/MMC. The BCME shall <br />include a site plan, written and graphic <br />depiction of the project’s biological <br />mitigation/monitoring program, and a <br />schedule. The BCME shall be approved by <br />MMC and referenced in the construction <br />documents. <br />E. Avian Protection Requirements - To <br />avoid any direct impacts to Cooper’s <br />hawk, rufous-crowned sparrow, and <br />coastal California gnatcatcher or any <br />species identified as listed, candidate, <br />sensitive, or special status in the MSCP, <br />removal of habitat that supports active <br />nests in the proposed area of disturbance <br />should occur outside of the breeding <br />season for these species (February 1 to <br />September 15). If removal of habitat in <br />the proposed area of disturbance must <br />occur during the breeding season, the <br />Qualified Biologist shall conduct a <br />preconstruction survey to determine the <br />presence or absence of nesting for these <br />three sensitive bird species on the <br />
The URL can be used to link to this page
Your browser does not support the video tag.