My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3 - The Bowery_PUBLIC COMMENT_RAMSEY
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2020
>
05-11-20
>
3 - The Bowery_PUBLIC COMMENT_RAMSEY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2020 10:02:45 PM
Creation date
11/9/2020 10:00:03 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Avion Project SEIR <br />Page S-16 <br />Table S-1 <br />Summary of Significant Environmental Impacts and Mitigation Measures <br />Environmental Issue Impacts Mitigation <br />Impact Level <br />After <br />Mitigation <br /> II. Prior to Start of Construction <br />A. Verification of Records Search <br />1. The PI shall provide verification to <br />MMC that a site specific records <br />search (1/4 mile radius) has been <br />completed. Verification includes, <br />but is not limited to a copy of a <br />confirmation letter from South <br />Coastal Information Center, or, if <br />the search was in-house, a letter of <br />verification from the PI stating that <br />the search was completed. <br />2. The letter shall introduce any <br />pertinent information concerning <br />expectations and probabilities of <br />discovery during trenching and/or <br />grading activities. <br />3. The PI may submit a detailed letter <br />to MMC requesting a reduction to <br />the ¼ mile radius. <br />
The URL can be used to link to this page
Your browser does not support the video tag.