My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3 - The Bowery_PUBLIC COMMENT_RAMSEY
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2020
>
05-11-20
>
3 - The Bowery_PUBLIC COMMENT_RAMSEY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2020 10:02:45 PM
Creation date
11/9/2020 10:00:03 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8.0 Cumulative Impacts <br />Avion Project SEIR <br />Page 8-5 <br />8.2.5 Noise <br />The 1998 EIR did not address cumulative impacts relative to construction noise. Construction of the <br />project would be temporary in nature. As described in Section 5.6, noise and vibration impacts <br />associated with impact hammering, rock drilling, and blasting would be less than significant, and <br />implementation of mitigation measure MM-BIO-1b would reduce noise impacts on the MHPA to a <br />level less than significant. Additionally, all the projects presented in Table 8-1 are constructed and <br />were required to implement measures to avoid construction noise impacts as necessary. Therefore, <br />when considered with other cumulative projects, the project would not result in a significant <br />cumulative impact related to noise. <br />
The URL can be used to link to this page
Your browser does not support the video tag.