My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3 - The Bowery_PUBLIC COMMENT_RAMSEY
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2020
>
05-11-20
>
3 - The Bowery_PUBLIC COMMENT_RAMSEY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2020 10:02:45 PM
Creation date
11/9/2020 10:00:03 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11.0 Mitigation Monitoring and Reporting Program <br />Avion Project SEIR <br />Page 11-7 <br />(CSVR). The CSVR shall be e-mailed to the MMC on the first day of monitoring, the first week <br />of each month, the last day of monitoring, and immediately in the case of any <br />undocumented condition or discovery. <br />B. Subsequent Resource Identification – The Qualified Biologist shall note/act to prevent any <br />new disturbances to habitat, flora, and/or fauna on-site (e.g., flag plant specimens for <br />avoidance during access, etc.). If active nests for Cooper’s hawk, rufous-crowned sparrow, <br />and coastal California gnatcatcher, or other previously unknown sensitive resources are <br />detected, all project activities that directly impact the resource shall be delayed until species <br />specific local, state or federal regulations have been determined and applied by the <br />Qualified Biologist. <br />III. Post Construction Measures <br />A. In the event that impacts exceed previously allowed amounts, additional impacts shall be <br />mitigated in accordance with City Biology Guidelines, ESL and MSCP, CEQA, and other <br />applicable local, state and federal law. The Qualified Biologist shall submit a final <br />BCME/report to the satisfaction of the City ADD/MMC within 30 days of construction <br />completion. <br />Cultural/Historical Resources <br />Historic Resources <br />MM-HIST-1: Archaeological Monitoring <br />I. Prior to Permit Issuance <br /> A. Entitlements Plan Check <br />1. Prior to issuance of any construction permits, including but not limited to, the first <br />Grading Permit, Demolition Plans/Permits and Building Plans/Permits or a Notice to <br />Proceed for Subdivisions, but prior to the first preconstruction meeting, whichever is <br />applicable, the Assistant Deputy Director (ADD) Environmental designee shall verify <br />that the requirements for Archaeological Monitoring and Native American <br />monitoring have been noted on the applicable construction documents through the <br />plan check process. <br /> B. Letters of Qualification have been submitted to ADD <br />1. The applicant shall submit a letter of verification to Mitigation Monitoring <br />Coordination (MMC) identifying the Principal Investigator (PI) for the project and the <br />names of all persons involved in the archaeological monitoring program, as defined <br />in the City of San Diego Historical Resources Guidelines (HRG). If applicable, <br />individuals involved in the archaeological monitoring program must have completed <br />the 40-hour HAZWOPER training with certification documentation.
The URL can be used to link to this page
Your browser does not support the video tag.