My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19F - RECEIVE AND FILE SEWER SYSTEM
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
11/17/2020
>
19F - RECEIVE AND FILE SEWER SYSTEM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 5:44:46 PM
Creation date
11/12/2020 3:16:53 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
19F
Date
11/17/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 of Santa Ana Section II: Sewer 5 <br />Plan <br />publicly available at the City's office and/or available on the internet. This SSMP must be approved by <br />the City Council at a public meeting. <br />12. In accordance with the California Business and Professions Code sections 6735, 7835, and 7835.1, all <br />engineering and geologic evaluations and judgments shall be performed by or under the direction of <br />registered professionals competent and proficient in the fields pertinent to the required activities. <br />Specific elements of the SSMP that require professional evaluation and judgments shall be prepared by <br />or under the direction of appropriately qualified professionals, and shall bear the professional(s)' <br />signature and stamp. <br />13. The mandatory elements of the SSMP are specified below. However, if the City believes that any <br />element of this section is not appropriate or applicable to the City's sanitary sewer system, the SSMP <br />program does not need to address that element. The City must justify why that element is not <br />applicable. The SSMP must be approved by the deadlines listed in Order No. 2006-0003-DWQ. <br />Sewer System Management Plan (SSMP) <br />1. Goal <br />2. Organization <br />3. Legal Authority <br />4. Operation and Maintenance Program <br />5. Design and Performance Provisions <br />6. Overflow Emergency Response Plan <br />7. FOG Control Program <br />8. System Evaluation and Capacity Assurance Plan <br />9. Monitoring, Measurement and Program Modifications <br />10. SSMP Program Audits <br />11. Communication Program <br />14. Both the SSMP and the City's program to implement the SSMP must be certified by the City to be in <br />compliance with the requirements set forth above and must be presented to the City Council for <br />approval at a public meeting. The City shall certify that the SSMP, and subparts thereof, are in <br />compliance with the general WDRs within the time frames identified in the time schedule provided in <br />subsection D.15, below. <br />In order to complete this certification, the City's authorized representative must complete the <br />certification portion in the Online SSO Database Questionnaire by checking the appropriate milestone <br />box, printing and signing the automated form, and sending the form to: <br />State Water Resources Control Board <br />Division of Water Quality <br />Attn: SSO Program Manager <br />P.O. Box 100 <br />Sacramento, CA 95812 <br />The SSMP must be updated every five (5) years, and must include any significant program changes. Re- <br />certification by the Council of the City is required in accordance with D.14 when significant updates to <br />April 2020 II-4 <br />19F-11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.