My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19F - RECEIVE AND FILE SEWER SYSTEM
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
11/17/2020
>
19F - RECEIVE AND FILE SEWER SYSTEM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 5:44:46 PM
Creation date
11/12/2020 3:16:53 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
19F
Date
11/17/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
State Water Resources Control Board Order No. 2006-0003-DWQ Page 14 of 20 <br />Statewide General WDR For Wastewater Collection Agencies 512106 <br />that escape from the system) associated with conditions similar to <br />those causing overflow events, estimates of the capacity of key <br />system components, hydraulic deficiencies (including components <br />of the system with limiting capacity) and the major sources that <br />contribute to the peak flows associated with overflow events; <br />(b) Design Criteria: Where design criteria do not exist or are <br />deficient, undertake the evaluation identified in (a) above to <br />establish appropriate design criteria; and <br />(c) Capacity Enhancement Measures: The steps needed to <br />establish a short- and long-term CIP to address identified <br />hydraulic deficiencies, including prioritization, alternatives <br />analysis, and schedules. The CIP may include increases in pipe <br />size, I/I reduction programs, increases and redundancy in <br />pumping capacity, and storage facilities. The CIP shall include an <br />implementation schedule and shall identify sources of funding. <br />(d) Schedule: The Enrollee shall develop a schedule of completion <br />dates for all portions of the capital improvement program <br />developed in (a)-(c) above. This schedule shall be reviewed and <br />updated consistent with the SSMP review and update <br />requirements as described in Section D. 14. <br />(ix) Monitoring, Measurement, and Program Modifications: The Enrollee <br />shall: <br />(a) Maintain relevant information that can be used to <br />establish and prioritize appropriate SSMP activities; <br />(b) Monitor the implementation and, where appropriate, <br />measure the effectiveness of each element of the <br />SSMP; <br />(c) Assess the success of the preventative maintenance <br />program; <br />(d) Update program elements, as appropriate, based on <br />monitoring or performance evaluations; and <br />(e) Identify and illustrate SSO trends, including: <br />frequency, location, and volume. <br />(x) SSMP Program Audits - As part of the SSMP, the Enrollee shall <br />conduct periodic internal audits, appropriate to the size of the system <br />and the number of SSOs. At a minimum, these audits must occur every <br />two years and a report must be prepared and kept on file. This audit <br />shall focus on evaluating the effectiveness of the SSMP and the <br />19F-51 <br />
The URL can be used to link to this page
Your browser does not support the video tag.