My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20C - AA FOR METER INFRASTRUCTURE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
11/17/2020
>
20C - AA FOR METER INFRASTRUCTURE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 5:46:26 PM
Creation date
11/12/2020 3:17:17 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20C
Date
11/17/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 16 of 52 <br />10.4 Report Frequency and Distribution. The following table sets forth the reporting <br />requirements for this Agreement. Please note the first report due date listed for each type of <br />report. <br />Required Reports Interim Reports Final Report <br />Performance Report <br />Format <br />No specific format required. See content <br />Summary of activities completed <br />requirements within Section 9.3 (2 CFR <br />during the entire period of <br />200.328) above. <br />performance is required. See <br />content requirements within Section <br />9.3 2 CFR 200.328 above. <br />Reporting Frequency <br />Semi -Annual <br />Final Report due within 90 days <br />after the end of the period of <br />performance. <br />Reporting Period <br />October 1 through March 31 and April 1 <br />Entire period of performance <br />through September 30. <br />Due Date <br />Within 30 days after the end of the <br />Final Report due within 90 days <br />Reporting Period. <br />after the end of the period of <br />performance or completion of the <br />project. <br />First Report Due <br />The first performance report is due for <br />N/A <br />Date <br />reporting eriod ending March 31, 2021. <br />Submit to: <br />Grants Officer at LCFA usbr.gov <br />Grants Officer at LCFA@usbr.gov <br />Federal Financial Re ort <br />Format <br />SF-425 (all sections must be completed) <br />SF-425(all sections must be <br />completed) <br />Reporting Frequency <br />Semi -Annual <br />Final Report due within 90 days <br />after the end of the period of <br />performance. <br />Reporting Period <br />October 1 through March 31 and April 1 <br />Entire period of performance <br />through September 30. <br />Due Date <br />Within 30 days after the end of the <br />Final Report due within 90 days <br />Reporting Period. <br />after the end of the period of <br />performance or completion of <br />project. <br />First Report Due <br />The first Federal financial report is due <br />N/A <br />Date <br />for reporting period ending <br />March 31, 2021. <br />Submit to: <br />Grants Officer at LCFA usbr. ov <br />Grants Officer at LCFA usbr. ov <br />Agreement No. R20AP00075 Agreement Template <br />20 C -18 (03/2019) <br />
The URL can be used to link to this page
Your browser does not support the video tag.