My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25G - AMGT FOR SPACE PLANNING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
11/17/2020
>
25G - AMGT FOR SPACE PLANNING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 5:55:10 PM
Creation date
11/12/2020 3:22:00 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25G
Date
11/17/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
528
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL <br />Space Planning and Architectural consulting Services <br />RFP No. 20-040 <br />COUNTY OF ORANGE I JOHN WAYNE AIRPORT <br />AIRPORT OPERATION CENTER REMODEL & UPGRADES I Santa Ana, CA <br />The scope of work for the Airport Operation Center (AOC) comprises numerous improvements to the <br />existing Thomas F. Riley, Terminal A including a temporary/redundant Sheriff Airport Operation's Center, <br />and a temporary/redundant maintenance response/operations center. In addition, renovations of <br />approximately 3,500 square feet of office related area in the Terminal A Administration suite to create a <br />new consolidated Airport Operations Center, Maintenance/BPOC spaces, computer room, Operations <br />spaces, and Public Affairs spaces. <br />IDS Group is providing full -spectrum services to include planning/programming, architectural, structural, <br />mechanical/plumbing, electrical, and security design services from project initiation through final <br />construction. <br />It is noted that the project delivery method for this project is CM -at -Risk (CMAR). As such, close <br />coordination with JWA and the selected contractor will be required from the beginning to the completion of <br />the construction in order to ensure all deliverables meet the expectation of all parties involved. <br />Space Planning <br />• ADA Compliance <br />Utility Coordination <br />Site Analysis <br />• Interiors I Material <br />Specifications <br />• Mechanical/Electrical Systems <br />• IT Coordination <br />Upgrades I Renovations <br />• Phasing / Move <br />Management <br />Cost Estimating <br />Structural Engineering <br />Contact: John Wayne Airport <br />Mr. Steve Chaky, Project Manager 1949.252.5171 I Design Completed: 2019 <br />u IDS GROUP <br />25G-30 <br />Page 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.