My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25G - AMGT FOR SPACE PLANNING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
11/17/2020
>
25G - AMGT FOR SPACE PLANNING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 5:55:10 PM
Creation date
11/12/2020 3:22:00 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25G
Date
11/17/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
528
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL <br />Space Planning and Architectural consulting Services <br />RFP No. 20-040 <br />f. References <br />Emcor Corporation <br />Alhambra Campus Space Planning, Renovations and Expansion, Alhambra, CA <br />Emcor is in the process of realigning the uses of it's building at the Alhambra <br />campus. The realignment will consolidate the uses in the easterly portion of <br />building #3 and remove all current uses for the renovations and expansion of <br />Building #2. <br />Mr. Steve De Sena, Senior Manager, Operations Support <br />626.293.3657 • Steve De Sena a❑Emcore.com <br />West Basin Municipal Water District <br />Donal L. Dear Building Space Allocation and Mocernization, Carson, CA <br />IDS was retained to prepare a Preliminary Design Report (P.D.R.). The scope <br />of work included review and evaluate the existing building and the preliminary <br />space plan completed in 2015. IDS approached this from a fact and data <br />gathering exercise that culminated in a distillation of the information gathered. <br />Mr. Don Zylstra, P.E., Senior Water Resources Engineer <br />310.660.6212 • DonZ@westbasin.org <br />City of Irvine <br />Workspace Relocationand Tenant Improvments, Irvine, <br />CA <br />The project required the reorganization of interrelated <br />offices in the police department, the expansion of its <br />locker/shower rooms, the redesign of the Traffic <br />Management department and the relocation of Public <br />Works and other departments to a separate building in a <br />new location. <br />Mr. Chris Brown, Senior Project Manager <br />949.724.6937 • chbrown 6ct cityofirvine.org <br />City of Azusa Light & Water Department <br />Space Planning, Remodel and Renovations, Azusa, CA <br />=17171= <br />l 171,7- <br />EI7 1 FIN <br />F16—1 ll-1;.-I F— ❑ r� fi 6-1 <br />GInI�❑nln,-irlGln <br />❑I�❑aCl-illl❑❑ <br />❑❑iii■ <br />IDS provided AE services to the City of Azusa for the remodeling and design services for its Customer <br />Service Lobby area. Scope of work included reconfigure an office supply and equipment storage room into <br />an office with four workstations; demolish the solid partition wall dividing five (5) Customer Service <br />Representative workstations from the lobby, convert an area into children's seating/ entertainment zone; <br />relocate security video cameras, television screens, phone lines, network conduit; and installation of <br />network switch, customer signage. <br />Ms. Judy Tran, Utilities Administrative & Financial Services Manager <br />626.812.5174 • itran(DazusaCA.gov <br />u IDS GROUP 25G-32 Page 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.