My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25G - AMGT FOR SPACE PLANNING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
11/17/2020
>
25G - AMGT FOR SPACE PLANNING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 5:55:10 PM
Creation date
11/12/2020 3:22:00 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25G
Date
11/17/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
528
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL <br />Space Planning and architectural consulting Services <br />RFP No. 20-040 <br />Faisal Dakhil, BSCE, MSCE <br />Cost Estimator <br />Mr. Dakhil has over 30 years of pre -construction, construction management, and <br />estimating experience in a wide spectrum of projects ranging in values from $1 <br />million to more than $250 million. As Senior PM and Chief Estimator of major <br />construction companies, Faisal has accumulated a long track record of <br />successful jobs coming in under budget and on -time, resulting in substantial <br />savings for the clients. <br />Education <br />• Master of Science, Civil Engineering, University of Southern California, Los Angeles, CA <br />• Bachelor of Science, Civil Engineering, University of Southern California, Los Angeles, CA <br />Building Evaluation Projects: <br />Rialto Birdsall Park Restroom & <br />City of Rialto <br />Rialto, Ca <br />3/15/2018 <br />260K <br />Building Evaluation: <br />Concession Building <br />Public <br />ADA Deficiencies and <br />Works <br />Repair <br />Rialto Fergusson Park Restroom <br />City of Rialto <br />Rialto, Ca <br />3/15/2018 <br />240K <br />Building Evaluation: <br />Building 1 <br />Public <br />ADA Deficiencies and <br />Works <br />Repair <br />Rialto Fergusson Park Snack Bar <br />City of Rialto <br />Rialto, Ca <br />3/15/2018 <br />100K <br />Building Evaluation: <br />& Restroom Building 2 <br />Public <br />ADA Deficiencies and <br />Works <br />Repair <br />Rialto Flores Park Restroom <br />City of Rialto <br />Rialto, Ca <br />3/15/2018 <br />170K <br />Building Evaluation: <br />Public <br />ADA Deficiencies and <br />Works <br />Repair <br />Rialto Jerry Eaves Park <br />City of Rialto <br />Rialto, Ca <br />3/15/2018 <br />258K <br />Building Evaluation: <br />Restroom & Snack Bar Building 1 <br />Public <br />ADA Deficiencies and <br />Works <br />Repair <br />Rialto Jerry Eaves Park <br />City of Rialto <br />Rialto, Ca <br />3/15/2018 <br />79K <br />Building Evaluation: <br />Restroom Building 2 <br />Public <br />ADA Deficiencies and <br />Works <br />Repair <br />Rialto City Park Restroom <br />City of Rialto <br />Rialto, Ca <br />3/15/2018 <br />142K <br />Building Evaluation: <br />Building & Concession Barl <br />Public <br />ADA Deficiencies and <br />Works <br />Repair <br />Rialto City Park Restroom, <br />City of Rialto <br />Rialto, Ca <br />3/15/2018 <br />360 <br />Building Evaluation: <br />Concession Kitchen and Press <br />Public <br />ADA Deficiencies and <br />Box Bar Building 2 <br />Works <br />Repair <br />Rialto Anderson Park Parking <br />City of Rialto <br />Rialto, Ca <br />In Progress <br />In <br />Building Evaluation: <br />and Path of Travel Walkways <br />Public <br />Progre <br />ADA Deficiencies and <br />Works <br />ss <br />Parking lot and <br />Walkways Repair <br />" IDS GROUP 25r -5O APPENDIX <br />
The URL can be used to link to this page
Your browser does not support the video tag.