My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25G - AMGT FOR SPACE PLANNING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
11/17/2020
>
25G - AMGT FOR SPACE PLANNING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 5:55:10 PM
Creation date
11/12/2020 3:22:00 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25G
Date
11/17/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
528
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL <br />Space Planning and Architectural Consulting Services <br />RFP No. 20-040 <br />Darren B. Smith, PE, BEAP, LEED AP <br />BD+C <br />Mechanical / Plumbing Project Manager <br />Darren Smith is a registered mechanical engineer with more than 23 years of <br />experience in both design bid build and design build projects. Darren is an <br />experienced design engineer and project manager with extensive experience in <br />designing and managing numerous construction projects requiring strong cross <br />communication at various levels of project ownership. <br />Education' <br />• Bachelor of Science, Mechanical Engineering Technology, Cal Poly, Pomona <br />Professional Credentials <br />• Licensed Mechanical Engineer: California (#M30841) <br />• LEED: Accredited Professional: Building Design and Construction <br />• ASHRAE: BEAP (Building Energy Auditing Professional) <br />Professional Affiliations <br />• ASHRAE (Past President, Orange Empire Chapter) <br />Relevant Project Experience <br />• William H. Hannon Library; Los Angeles, CA: $120 million, 121,000-sf. The facility, which comprises <br />three above -ground floors and a two-story basement. The basement provides storage for nearly 1.2 <br />million volumes with archival grade temperature and humidity control. Space programming also <br />includes more than 80 collaborative study rooms and workstations; a reading room; a cafe and media <br />lounge; and multi -media spaces. The new facility was designed with a focus on energy efficiency and <br />a small environmental footprint. LEED Gold certified. <br />• Amgen Workplace of the Future; Thousand Oaks, CA: Developed system program requirements <br />and goals for designing Amgen's new office of the future. Assisted design and commissioned <br />completed project. <br />• Westin Anaheim Resort; Anaheim, CA: The convention center resort is a $25-million Mechanical <br />and Plumbing project for 613-room Hotel. The new four -diamond -level property is slated to open in <br />2020. Darren led the redesign team for mechanical and plumbing to get the project within budget and <br />improving the energy efficiency of the project to meet the mandated efficiency targets. <br />• UC Irvine Strategic Energy Plan: Review of 4.4 million square feet for energy savings projects. <br />Identification, savings calculation and design. Surpassed savings target of 1.23 million dollars per year. <br />(Design Build) Realized savings of 10,420,599 kWh and 174,275 therms per year in order to earn <br />incentives of more than $2 million from the investor -owned utilities. Started January 2009 with <br />construction completion in December. <br />AA IDS GROUP 25G-52 APPENDIX <br />
The URL can be used to link to this page
Your browser does not support the video tag.