My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25H - AGMT FOR METER READING AND MANAGEMENT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
11/17/2020
>
25H - AGMT FOR METER READING AND MANAGEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 5:27:31 PM
Creation date
11/12/2020 3:23:03 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Finance & Management Services
Item #
25H
Date
11/17/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
only a reading is required to complete. Resulting in no field visit required. <br />3.1.2.5. Allow the MDMS the ability to generate a work order in the CIS for 3 defined <br />actions. These actions will be determined at the MDMS discovery session with The <br />City and the associated process in the CIS will be established. Additional actions will <br />require a change order. An example of actions could be the MDMS identifies <br />unauthorized tampering or outage. The MDMS will generate a work order type in the <br />CIS to be executed. <br />3.1.2.6. The MultiSpeak® version will be 4.1 for this integration. <br />3.1.2.7. CIS to MDMS Oracle views provisioning (AMI Stage 1).All other MultiSpeak <br />integrations between MDMS and CIS will be part of AMI Stage 2. <br />3.1.2.8. Automated meter exchanges to be completed in CIS by integrating with an external <br />vendor Work Order Management System in AMI Stage 2. <br />3.2. Testing/Training <br />3.2.1. Testing <br />3.2.1.1. Test Plans and test cases are the responsibility of the Customer PM. S&S will <br />provide sample test cases and recommended plans based on new functional AMI <br />process, but the Customer PM ultimately understands the Customer business processes. <br />The AMI Stage 1 testing will align itself with the testing objectives of the Upgrade <br />25H- 100 Page 93 <br />
The URL can be used to link to this page
Your browser does not support the video tag.