Laserfiche WebLink
4.1.7. Non AMI meters will be read for Billing using current method. <br />4.1.8. CIS Auto -Void reconnect functionality will be established during this stage. <br />4.1.9. Remote Disconnect / Reconnect of out of scope for this phase. Analysis between <br />vendors and business requirements document should be established and agreed upon before <br />integration begins. <br />4.2. AMI Stage 2 <br />4.2.1. The AMI project Team will turn on the AMI control code and activate the <br />webservice methods in the enQuesta train environment once the 30 days post go -live of the <br />enQuesta V6 upgrade. Providing ample time for the Upgrade team and AMI Stage 1 to be <br />supported post go -live. <br />4.2.2. The MultiSpeak® Web services will be used to achieve real time integration version <br />will be 4.1 for this integration. <br />4.2.3. The current meter reading solution will be modified to not include AMI meters. <br />4.2.4. Meter Reading will continue to be used for non AMI meters and readings will be <br />posted into the CIS month file as currently performed. The monthly billing read for Non <br />AMI meters will not be stored in the MDMS system. <br />4.2.5. Remote disconnect/reconnects on demand reads is to be implemented during this <br />Stage. If changes are required/ desired the change control process will be utilized t0 track <br />25H-10$ Page101 <br />