Laserfiche WebLink
5.1.4. Initial setup of Payment Shutoff Void / Turn On action <br />P.,meM sn.<-on void in.. O- Ad!., i lids LZ 11- I g n I a* <br />a f-•-'•-� -ice <br />yam^ r, �A IemiI, rmi <br />a^ i Comm¢.¢ w^.. ome. <br />.......,�, <br />� ...... <br />..k ..r....«a <br />�� <br />P^ <br />F—� <br />N^ I I�w.,, <br />J <br />J <br />°0 Fl---,— <br />9° '^ C <br />J I F ----- <br />0 7-777777-:7 <br />Fc—c, <br />P,-] <br />5.2. Synchronization / Provisioning <br />5.2.1. The CIS system will need to provide data to the MDMS to ensure synchronization of <br />Account Number, Meter Number, Billing Cycle, locations, billing schedules, connection <br />status', etc etc. <br />5.2.2. The full periodic synchronization know as provisioning will be done from CIS using <br />database views. This will allow the MDMS to avoid issues that can arise when changes are <br />put into the CIS systems. (i.e., The CIS does not need to track changes). <br />5.2.3. The front end AMI system will also need to be provisioned from the CIS system. A <br />program will be established and will be capable of running on demand or part of job <br />scheduling. This file format will be .CSV. The follow is a list of data elements required from <br />Sensus analytics/SMA module data requirements. A business requirements document will be <br />25H-111 Page104 <br />