My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20B - AA FOR WATER MAIN REPLACEMENT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
11/17/2020
>
20B - AA FOR WATER MAIN REPLACEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 5:45:40 PM
Creation date
11/12/2020 3:26:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20B
Date
11/17/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ALI_ CITIES ENGINEERING INC. <br />References <br />1. City of Pico Rivera <br />Project name: Passons Bridge underpass <br />Value: $200,000.00 <br />Description: Remove and repair PVC pipe and construct concrete V gutters, curbs and Landscape. <br />Contact: Kenner Guerrero (562) 801-4351 <br />2. City of Pico Rivera <br />Project Name: Citywide Concrete Improvements <br />Value: $220,000.00 <br />Description: Remove and repair various sidewalks, curb and gutters, ADA ramps, curbs, and trees <br />throughout the City. <br />Contact: Kenner Guerrero (562) 801-4351 <br />3. City of San Jacinto <br />Project Name: Pedestrian Upgrades <br />Value:$225,000.00 <br />Description: Remove and replace various ADA Ramps, driveway approach, and sidewalk throughout the <br />City. <br />Contact: Sean Motlagh (949) 232-6153 <br />4. City of San Jacinto <br />Project Name: Citywide Upgrades <br />Value:$100,000 <br />Description: Repair various manhole, repair curb inlets, and repair AC pavement. <br />Contact: Danny Astorga (951) 634-5261 <br />1 <br />20B-37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.