My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20B - AA FOR WATER MAIN REPLACEMENT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
11/17/2020
>
20B - AA FOR WATER MAIN REPLACEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 5:45:40 PM
Creation date
11/12/2020 3:26:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20B
Date
11/17/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ALL CITIES BNGINI',Ii1tING INC. <br />12. City of Downey <br />Project Name: Woodruff Water Main Improvements <br />Value: $1,900,000 <br />Description: Remove and replace existing 8" and 12" water main pipe, 1"-4" water services, <br />fire hydrants, FDC, water meters, valves, concrete, and asphalt in various locations. <br />Contact: Lorena Powell (562) 302-3865 <br />Completed: 6/20/20 <br />13. City of Santa Ana <br />0 <br />rl- -1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.