Laserfiche WebLink
II. <br />review the Basic Concept Drawings <br />and approve or disapprove same <br />6. <br />Submission of Design Development <br />Completed. <br />Drawings for the Project. The <br />Developer shall prepare and submit to <br />the City, complete Design <br />Development Drawings <br />7. <br />Review of Design Development <br />Completed. <br />Drawings and Approval or <br />Disapproval Thereof. The Planning <br />and Building Agency shall consider <br />and approve or disapprove the Design <br />Development Drawings. <br />8. <br />Submission of Application for Site <br />Completed. <br />Plan Review of the Project. The <br />Developer shall prepare and submit to <br />the City a complete Application for <br />site plan review. <br />9. <br />Review of Project Application and <br />Completed. <br />Approval or Disapproval Thereof. <br />The Planning Commission shall <br />consider and approve or disapprove <br />the Application. <br />to. <br />Review of Project Application and <br />Will be completed concurrently with <br />Approval or Disapproval Thereof. <br />entitlement and DDA approval by City <br />The City Council shall consider and <br />Council. <br />approve or disapprove the Application <br />I.IAVa1KUl:11U1V LKAWIINkxN A1VL <br />11. Submission of Complete <br />Construction Drawings and <br />Grading Plans. Developer shall <br />submit to the Planning and Building <br />Agency complete Construction <br />Drawings and Grading Plans. <br />MAINS <br />Within 8 month after City Council approval of <br />Project, Developer will submit complete <br />construction drawings and grading plans. <br />12. Approval of Complete I Within 3 months after submittal of complete <br />Construction Drawings. The Lconstruction drawings and grading plans, the <br />Exhibit `B" <br />Performance Schedule <br />55394.00049M239203.12 <br />