My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20D - AA FOR WASHINGTON AVE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
12/01/2020
>
20D - AA FOR WASHINGTON AVE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 12:12:37 PM
Creation date
11/25/2020 12:06:00 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20D
Date
12/1/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 8 of 52 <br />6. RESPONSIBILITY OF THE PARTIES <br />6.1 Recipient Responsibilities <br />6.1.1 The Recipient shall carry out the Scope of Work (SOW) in accordance with the terms and <br />conditions stated herein. The Recipient shall adhere to Federal, state, and local laws, regulations, <br />and codes, as applicable, and shall obtain all required approvals and permits. If the SOW <br />contains construction activities, the Recipient is responsible for construction inspection, <br />oversight, and acceptance. If applicable, the Recipient shall also coordinate and obtain approvals <br />from site owners and operators. <br />6.1.2. Construction Federal Funds. Federal cost -share for the construction in the amount of <br />$671,580.00 will be suspended in the ASAP payment system and shall not be considered <br />reimbursable until the Recipient has received a formal notification from the Grants Officer as <br />specified in Section L6.1.3 Post Award Cost Documentation. <br />6.1.3. Post -Award Cost Documentation. During pre -award clarifications, there was <br />insufficient documentation to support the construction contracts estimate. Therefore, prior to the <br />initial request for drawdown of Federal funding, the Recipient shall provide the final competitive <br />bid documents to include proposal/quote requests, bid tabulations/schedule, and selection <br />documentation. The Grants Officer approval of the construction contract costs will be <br />documented by formal modification to the Agreement. <br />6.1.4 Notice to Proceed. Construction costs shall not be considered reimbursable until the <br />Recipient has received a formal Notice to Proceed from the GO upon completion of <br />environmental compliance activities. See below Section I.11. Regulatory Compliance for more <br />information. <br />6.1.5 Interim Performance Reports. The Recipient shall prepare and submit to Reclamation <br />interim Project performance reports (Interim Performance Reports) as required by Section I.10 of <br />this Agreement. Each Interim Performance Report will include (but is not limited to) the <br />information identified in paragraph I.10.3 and will discuss the following: <br />• A comparison of actual accomplishments to the milestones established by the financial <br />assistance agreement for the reporting period <br />• The reasons why established milestones were not met, if applicable <br />• The status of milestones from the previous reporting period that were not met, if <br />applicable <br />• Whether the Project is on schedule and within the original cost estimate <br />• Any additional pertinent information or issues related to the status of the Project <br />Agreement No. R20AP00113 <br />Agreement Template <br />20 D-11 (03/2019) <br />
The URL can be used to link to this page
Your browser does not support the video tag.