My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75C - PH MORTIMER MIXED USE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
12/01/2020
>
75C - PH MORTIMER MIXED USE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 12:21:50 PM
Creation date
11/25/2020 12:09:02 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75C
Date
12/1/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
483
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />Conditions for Approval for Site Plan Review No. 2020-03 <br />Site Plan Review No. 2020-03 is approved subject to compliance, to the reasonable <br />satisfaction of the Planning Manager, with applicable sections of the Santa Ana Municipal <br />Code, the California Administrative Code, the California Building Standards Code, and all <br />other applicable regulations. In addition, it shall meet the following conditions of approval: <br />The Applicant must comply with each and every condition listed below Prior to exercising <br />the rights conferred by this site plan review. <br />The Applicant must remain in compliance with all conditions listed below throughout the <br />life of the development project. Failure to comply with each and every condition may result <br />in the revocation of the site plan review. <br />1. All proposed site improvements must conform to the Site Plan Review (DP No. 2018- <br />28) and the staff report exhibits incorporated herein by reference. - <br />2. Any amendment to this site plan review, including modifications to approved materials, <br />finishes, architecture, site plan, landscaping, unit count, mix, and square footages must <br />be submitted to the Planning Division for review. At that time, staff will determine if <br />administrative relief is available or if the site plan review must be amended. <br />3. A final detailed amenity plan must be reviewed and approved prior to issuance of any <br />building permits. The plan shall include details on the hardscape design, lighting <br />concepts and outdoor furniture for amenity, plaza, or courtyard areas as well as an <br />installation plan. The exact specifications for these items are subject to the review and <br />approval by the Planning Division. <br />4. Prior to issuance of building permits, the Applicant shall submit a construction schedule <br />and staging plan to the Planning Division for review and approval. The plan shall <br />include construction hours, staging areas, parking and site security/screening during <br />project construction. <br />5. Prior to the issuance of a building permit, a full landscape and irrigation plan is to be <br />submitted for review and approval. The landscape plan shall: (1) conform to the <br />commercial landscape standards, Citywide Design Guidelines, and the City's Water <br />Efficient Landscape Ordinance, and (2) contain regularly -spaced vines installed along <br />the entire lengths of the new perimeter wall and the trash enclosure so as to form a <br />natural graffiti deterrent. <br />6. Prior to the issuance of a building permit, a Public Art Plan must be submitted to the <br />Planning Division for review and approval. The aApplicant shall work with the City's <br />Arts & Culture Office to identify local artist, and receive recommendations on <br />establishing a process for selecting and displaying such local artwork. <br />75C-362 <br />
The URL can be used to link to this page
Your browser does not support the video tag.