My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75C - PH MORTIMER MIXED USE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
12/01/2020
>
75C - PH MORTIMER MIXED USE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 12:21:50 PM
Creation date
11/25/2020 12:09:02 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75C
Date
12/1/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
483
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Richard M. Gollis, Principal <br />THE CONCORD GROUP <br />June 3, 2020 <br />Page 14 <br />non-residential (5 percent). For permanent impacts, the estimated sales from the residential <br />complex, the restaurant space, and the retail space were used. IMPLAN breaks down the <br />resulting employment and other effects into three categories: direct, indirect, and induced: <br />• Direct Effects — Refers to the direct effects that occur on the Project site resulting from <br />development costs and operational sales revenue. <br />Indirect Effects — Changes in sales, jobs, and/or income within the businesses that supply <br />goods and services to the Project. Indirect effects do not occur directly on the Project -site <br />but are an indirect effect to surrounding or related businesses. <br />Induced Effects — Regional changes resulting from additional spending earned either <br />directly or indirectly from the Project. <br />RSG utilizes the FTE conversion of total employment generally preferred in Public Policy. FTE <br />employment numbers, as opposed to residents, present total employment through the lens of <br />hours worked; summarizing then dividing by how many 40-hour work weeks are generated by the <br />investment. The IMPLAN analysis concludes that the temporary construction component of the <br />Project will result in 510 direct FTE jobs, 47 indirect FTE jobs, and 214 induced FTE jobs the <br />majority of which will be in Santa Ana. <br />The permanent impacts attributed to the Project are 35 FTE jobs related to the operations of both <br />the residential building itself, as well as the retail and restaurant components of the Project. This <br />includes 25 direct, 4 indirect, and 5 induced jobs to the region. <br />Table 10 outlines the aforementioned FTE jobs generated by the Project. <br />75C-458 <br />
The URL can be used to link to this page
Your browser does not support the video tag.