Laserfiche WebLink
SHC4nSWs OnPha" NumDays 10,00 53.00 <br />................. ............ i............................. --- ------------------------- .......................... <br />thLOra CtDnPhase NumDays 220.00 307.00 <br />............... .............. d_....___._..__._.._..__._.._.>_----------------------------- -------------------------- <br />thc( -Sftd Maw NumDays 20,00 23,00 <br />............d............................. d•--- —_--- _________ ......_ ......... <br />I--------------- Num0a --- 44.00 <br />I........tionP... NumDays 10.00 24.00 <br />As a result of these changes, the model includes a construction schedule as follows (Appendix B, pp. 84, <br />116, 237): <br />NUMW <br />......_I ... ......................... <br />i •SiK Pray..... <br />1_______________. <br />•Silo <br />......_�........... ... .. ........ <br />•Grating <br />1_______________. <br />------- <br />•Grading <br />1_____------- ____________ <br />l___di <br />nO Construs <br />- <br />I... <br />1------------- <br />COOOng <br />As demonstrated in the excerpts above, the demolition construction phase is increased by 15%, from <br />the default value of 20 to 23 days; the site preparation remains at the default value of 3 days; the <br />grading construction phase is increased by approximately 633%, from the default value of 6 to 44 days; <br />the building construction phase is increased by approximately 40%, from the default value of 220 to 307 <br />days; the paving construction phase is increased by 140%, from the default value of 10 to 24 days; and <br />the architectural coating phase is increased by 430%, from the default value of 10 to 53 days. As <br />previously mentioned, the CalEEMod User's Guide requires any changes to model defaults be justified.' <br />According to the "User Entered Comments & Non -Default Data" table, the justification provided for <br />these changes is: "Estimated construction schedule based on construction questionnaire" (Appendix B, <br />pp. 79, 111, 231). However, the Addendum and associated documents fail to disclose a construction <br />questionnaire. <br />Furthermore, the Addendum states that "[c]onstruction is anticipated to take 21 to 24 months is <br />expected to begin in September 2021" (p. 2-11). However, while the total construction schedule is <br />approximately 21 months, from 9/1/2021 to 5/29/2023, the Addendum and associated documents fail <br />to provide the specific individual construction phase lengths. As a result, we cannot verify the reivsed <br />construction schedules and individual construction phase lengths included in the model. <br />These unsubstantiated changes improperly spread out construction emissions over a longer period of <br />time for some construction phases and not others. According to the CalEEMod User's Guide, each <br />construction phase is associated with different emissions activities (see excerpt below)." <br />'Ca I EEMod User Guide, available at: httD://www.caleemod.com/. p. 2, 9 <br />10 "CalEEMod User's Guide." CAPCOA, November 2017, available at: httD://www.aamd.gov/docs/default- <br />source/caleemod/01 user-39-s-euide2016-3-2 15november2017.Ddf?sfvrsn=4, p. 31. <br />75C-79 <br />