My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75D - PH N MOUNTAIN VIEW
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
12/01/2020
>
75D - PH N MOUNTAIN VIEW
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 12:16:20 PM
Creation date
11/25/2020 12:09:50 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75D
Date
12/1/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B <br />MITIGATION MONITORING AND REPORTING PROGRAM <br />The following is a Mitigation Monitoring and Reporting Program (MMRP) for the Mountain <br />View Avenue Condominiums located at 301 and 305 Mountain View Avenue, Santa Ana, CA. <br />This MMRP has been prepared pursuant to Section 15097 of the California Environmental <br />Quality Act (CEQA) Guidelines and Section 21081 of the Public Resources Code. The MMRP <br />lists all applicable Project Mitigation Measures (MM) and environmental commitments that are <br />required to be implemented with the Project under existing Standard Condition Plans, Programs, <br />and Policies (SC) for implementing environmental resource protection legislation. This MMRP <br />includes implementation timing and responsible party to ensure proper enforcement of all MM <br />and SC to reduce Project impacts. The City of Santa Ana, as the Lead Agency, will utilize the <br />MMRP to document the implementation of Project mitigation and SC environmental <br />commitments, which ensure all project impacts are reduced to less than significance pursuant to <br />the CEQA. <br />Date <br />Mitigation- <br />Mitigation MeasaKe <br />Responsible <br />` <br />Timing' <br />Completed <br />Number, <br />'`4s <br />Party <br />and <br />Initials <br />AESTHETICS <br />MM AES-1 <br />The Contractor shall partition active <br />Contractor <br />During all <br />areas of construction, stockpiles and <br />and City <br />phases of <br />materials storage locations; and, shall <br />Inspector <br />construction <br />perform all work with downlighting and <br />installation of a barrier to confine <br />construction -related light and glare into <br />active construction zones and to <br />minimize spillover light and glare from <br />construction equipment onto adjacent <br />areas by implementing the following: <br />(a) A temporary barrier between <br />nearby residences and areas <br />of active construction will be <br />placed. <br />(b) Temporary security lighting <br />must be low voltage and <br />downlit. <br />AIR QUALITY <br />MM AQ-1 <br />Emissions controls and fugitive dust <br />Contractor as <br />During all <br />emissions controls will be implemented to <br />verified by <br />phases of <br />reduce airborne dust contributing to <br />City Planner <br />construction <br />PM10 and PM2.5 pursuant to SXAQMD <br />and City <br />Rules 403 for PM and PM2.5 and <br />Engineer, <br />pursuant to Rule 1466 pertaining to toxic <br />construction <br />Resolution No. 2020-xx <br />Page 6 of 20 <br />75D-11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.