My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75D - PH N MOUNTAIN VIEW
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
12/01/2020
>
75D - PH N MOUNTAIN VIEW
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 12:16:20 PM
Creation date
11/25/2020 12:09:50 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75D
Date
12/1/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BIOLOGY <br />SC BIO-1 <br />Plans and specifications for the project <br />Project <br />Prior to <br />shall include the following note prior to <br />proponent as <br />issuance of <br />issuance of permits to reduce impacts <br />verified by <br />permits during <br />from vegetation trimming and clearing, <br />City Planner <br />avian breeding <br />tree trimming and removals, generation of <br />and <br />season, Feb 1 <br />mechanical noise or ground disturbance <br />Contractor as <br />— Sept 1 and <br />on active bird nests from native nesting <br />verified by <br />verified <br />birds: Active avian nests shall be avoided <br />City <br />throughout <br />by the contractor by scheduling these <br />inspector. <br />construction <br />construction activities outside of the avian <br />stages <br />breeding season, which is typically during <br />February 1 to September 1. <br />SC BIO-2 <br />Plans and specifications for the project <br />Project <br />Prior to <br />shall include the following note prior to <br />proponent as <br />issuance of <br />issuance of permits to reduce impacts on <br />verified by <br />permits during <br />nesting birds prior to commencement of <br />the City <br />avian breeding <br />work during the typical nesting season, <br />Planner and <br />season, Feb 1 <br />the contractor shall hire a qualified <br />Contractor as <br />— Sept 1 and <br />biologist to conduct a nest survey, within <br />verified by <br />verified <br />the project boundaries and within a 1,000- <br />City <br />throughout <br />foot radius buffer, three days in advance <br />inspector, <br />construction <br />of the start of construction (for work <br />Project <br />stages <br />beginning approximately between <br />Biologist, <br />February I and September 1). This survey <br />Arborist <br />for bird nests will report the location of <br />nesting birds that could be impacted by <br />the project for species covered under the <br />Migratory Bird Treaty Act and Fish and <br />Game Code sections 3503, 3503.5, and <br />3513. <br />SC BIO-3 <br />Plans and specifications for the project <br />Project <br />Prior to <br />shall include the following note prior to <br />proponent as <br />issuance of <br />issuance of permits to reduce impacts on <br />verified by <br />permits during <br />birds If active nests are found, the <br />the City <br />avian breeding <br />biologist will be retained for construction <br />Planner and <br />season, Feb 1 <br />monitoring and to coordinate with CDFW <br />Contractor as <br />— Sept 1 and <br />on establishing specific buffers around <br />verified by <br />verified <br />nests that are sufficient to ensure that <br />City <br />throughout <br />breeding is not likely to be disrupted or <br />inspector, <br />construction <br />adversely impacted by construction <br />Project <br />stages <br />pursuant to CDFW requirements. Buffers <br />Biologist, <br />around active nests will be established <br />Arborist <br />pursuant to CDFW protocol or <br />determination by a qualified CDFW <br />biologist for smaller buffers which are <br />sufficient to avoid impacts to nesting <br />birds. Buffers will be maintained until <br />young have fledged or the nests become <br />inactive. Factors for consideration on nest <br />buffers will include: <br />Resolution No. 2020-xx <br />Page 9 of 20 <br />75D-14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.