My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-095 - Adopting a Mitigated Negative Declaration and Mitigation Monitoring
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2020
>
2020-095 - Adopting a Mitigated Negative Declaration and Mitigation Monitoring
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2020 8:52:27 AM
Creation date
12/4/2020 8:51:36 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Agency
Clerk of the Council
Doc #
2020-095
Date
12/1/2020
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
into development plans and <br />the City <br />During <br />specifications for the project. <br />Engineer and <br />Construction <br />Building <br />Official/hispe <br />ctor <br />SC HYD-3 <br />Prior to issuance of grading and <br />Project <br />During Plan <br />building permits, erosion control <br />Proponent as <br />Check and <br />measures shall be included in final <br />verified by <br />Ongoing <br />plans and specifications including <br />the City <br />During <br />but not limited to provisions a-d <br />Engineer and <br />Construction <br />below: <br />Building <br />Official/ <br />a) Twice daily minimum <br />Inspector <br />sweeping of track -out areas. <br />b) Cover haul loads and stockpiles <br />with tarps. <br />c) Maintain adequate soil <br />moisture in disturbed surfaces <br />during and after grading. <br />d) Reduce construction vehicle <br />speeds and idling times. <br />NOISE <br />MM NOI-1 <br />Final plans and specifications for the <br />Project <br />During Plan <br />project shall include a note as <br />Proponent as <br />Check and <br />follows: During demolition and <br />verified by <br />Ongoing <br />construction, the contractor shall <br />the Building <br />During <br />install noise source reduction or noise <br />Official and <br />Construction <br />barriers and shall measure the <br />Building <br />effectiveness of said noise mitigation <br />Inspector <br />_to-documentthaLprojjecS construction <br />does not exceed the FTA threshold of <br />80 dB at nearby residential land uses. <br />Said noise mitigation shall include but <br />not be limited to the following: <br />a) Shall fit equipment at the <br />project site mufflers <br />providing at least 8 dB of <br />noise reduction, or <br />b) Shall construct temporary <br />enclosures or acoustical <br />tents that provide at least 8 <br />dB of noise; and <br />c) Shall measure and <br />document the effectiveness <br />of the implemented noise <br />abatement measures <br />Resolution No. 2020-095 <br />Page 18 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.