Laserfiche WebLink
to leaving the Project Area; <br />(j) Segregate and label TAC <br />stock piles and apply <br />stabilizers, and 10mm plastic <br />overlapping and anchored <br />sheeting; <br />(k) Cease activities during high <br />winds (15 miles per hour over <br />a 15-minute period or <br />instantaneous wind speeds <br />exceeding 25 MPH); and <br />(1) Proper notification of <br />SCAQMD prior to <br />earthmovin <br />MM AQ-2 <br />Construction emissions will be reduced <br />Contractor as <br />During all <br />according to the following: <br />verified by <br />phases of <br />City Planner <br />construction <br />(a) Disturbed areas will be <br />and City <br />stabilized at the end of each <br />Engineer, <br />day with trench plates or <br />construction <br />similar devices. <br />staff <br />(b) Idling on construction <br />equipment and vehicles will <br />be limited to 5 minutes; <br />(c) The project will implement <br />Tier IV mitigation to reduce <br />exhaust from -diesel -powered— --- — <br />engines in compliance with <br />AQMD; <br />(d) The project will implement <br />Tier III engines; and <br />(e) Construction staff will <br />carpool. <br />MM AQ-3 <br />Project plans and specifications shall <br />City <br />During all <br />incorporate a temporary signage plan for <br />Engineer, <br />phases of <br />the Project, which shall be verified by the <br />Contractor <br />construction <br />City Engineer, and shall include a <br />and City <br />feedback phone number. The Contractor <br />Inspector <br />shall post Project Area will be with a <br />phone number intended for 24n feedback <br />to the Contractor and City from the <br />community according to approved plans. <br />Resolution No. 2020-095 <br />Page 8 of 20 <br />