My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IDS GROUP
Clerk
>
Contracts / Agreements
>
I
>
IDS GROUP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 8:55:02 AM
Creation date
12/4/2020 3:01:46 PM
Metadata
Fields
Template:
Contracts
Company Name
IDS GROUP
Contract #
A-2020-230-01
Agency
Public Works
Council Approval Date
11/17/2020
Expiration Date
11/16/2023
Insurance Exp Date
11/12/2023
Destruction Year
2028
Notes
CTRAX
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL <br />Space Planning and Architectural Consulting Services <br />RFP No. 20-040 <br />COUNTY OF ORANGE I JOHN WAYNE AIRPORT <br />AIRPORT OPERATION CENTER REMODEL & UPGRADES I Santa Ana, CA <br />The scope of work for the Airport Operation Center (AOC) comprises numerous improvements to the <br />existing Thomas F. Riley, Terminal A including a temporary/redundant Sheriff Airport Operation's Center, <br />and a temporary/redundant maintenance response/operations center. In addition, renovations of <br />approximately 3,500 square feet of office related area in the Terminal A Administration suite to create a <br />new consolidated Airport Operations Center, Maintenance/BPOC spaces, computer room, Operations <br />spaces, and Public Affairs spaces. <br />IDS Group is providing full -spectrum services to include planning/programming, architectural, structural, <br />mechanical/plumbing, electrical, and security design services from project initiation through final <br />construction. <br />It is noted that the project delivery method for this project is CM -at -Risk (CMAR). As such, close <br />coordination with JWA and the selected contractor will be required from the beginning to the completion of <br />the construction in order to ensure all deliverables meet the expectation of all parties involved. <br />■ Space Planning 0 Interiors I Material 0 Upgrades I Renovations <br />■ ADA Compliance Specifications 0 Phasing / Move <br />• Utility Coordination Mechanical/Electrical Systems Management <br />• Site Analysis IT Coordination 0 Cost Estimating <br />■ Structural Engineering <br />Contact: John Wayne Airport <br />Mr. Steve Chaky, Project Manager 1 949.252.5171 1 Design Completed: 2019 <br />&r IDS GROUP 25G-30 Page 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.