Laserfiche WebLink
PROPOSAL <br />Space Planning and Architectural Consulting Services <br />RFP No. 20-040 <br />f. References <br />Emcor Corporation <br />Alhambra Campus Space Planning, Renovations and Expansion, Alhambra, CA <br />Emcor is in the process of realigning the uses of it's building at the Alhambra <br />campus. The realignment will consolidate the uses in the easterly portion of <br />building #3 and remove all current uses for the renovations and expansion of <br />Building #2. <br />Mr. Steve De Sena, Senior Manager, Operations Support <br />626.293.3657 • Steve De SenaC(DEmcore.com <br />West Basin Municipal Water District <br />Donal L. Dear Building Space Allocation and Mocernization, Carson, CA <br />IDS was retained to prepare a Preliminary Design Report (P.D.R.). The scope <br />of work included review and evaluate the existing building and the preliminary <br />space plan completed in 2015. IDS approached this from a fact and data <br />gathering exercise that culminated in a distillation of the information gathered. <br />Mr. Don Zylstra, P.E., Senior Water Resources Engineer <br />310.660.6212 • DonZ@westbasin.org <br />City of Irvine <br />Workspace Relocationand Tenant Improvments, Irvine, <br />CA <br />The project required the reorganization of interrelated <br />offices in the police department, the expansion of its <br />locker/shower rooms, the redesign of the Traffic <br />Management department and the relocation of Public <br />Works and other departments to a separate building in a <br />new location. <br />Mr. Chris Brown, Senior Project Manager <br />949.724.6937 • chbrown(a)cityofirvine.orci <br />City of Azusa Light & Water Department <br />Space Planning, Remodel and Renovations, Azusa, CA <br />J �F� <br />1 <br />1 �Ll <br />IDS provided AE services to the City of Azusa for the remodeling and design services for its Customer <br />Service Lobby area. Scope of work included reconfigure an office supply and equipment storage room into <br />an office with four workstations; demolish the solid partition wall dividing five (5) Customer Service <br />Representative workstations from the lobby, convert an area into children's seating/ entertainment zone; <br />relocate security video cameras, television screens, phone lines, network conduit; and installation of <br />network switch, customer signage. <br />Ms. Judy Tran, Utilities Administrative & Financial Services Manager <br />626.812.5174 • itranC@azusaCA.gov <br />,A IDS GROUP 25G-32 Page 17 <br />