Laserfiche WebLink
Experience: <br />Years of Experience: 12 <br />Registration: <br />Professional Engineer, CA, <br />M35789 <br />LEED Accredited Professional <br />Education: <br />M.S. Mechanical <br />Engineering, University of <br />Bridgeport (CT), 2006 <br />B.E. Mechanical <br />Engineering, Sarder Patel <br />University (India), 2002 <br />Professional Affiliations: <br />ASHRAE Associate Member <br />since 2006 <br />Space Planning & Architectural Consulting Services (RFP No, 20-04 <br />Hiten Sheth P.E., LEED'R' AP <br />Principal 1 Mechanical Engineer <br />Role in the Project: <br />As the Principal/Mechanical Engineer, he is committed to managing projects as MEP leader with hands <br />on design work, in-house quality control and coordination between various trades to ensure accuracy in <br />the delivery of every project personally for every client. <br />Experience with the requirement and tasks: <br />Mr. Sheth has more than 10 years of experience of engineering and design for various heating, ventilation <br />and air conditioning systems such as variable air volume system (VAV), constant air volume (DX and <br />Package), chilled water and heating hot water based central plants, variable refrigerant flow system <br />(VRFs), under floor displacement ventilation systems (UFADs) and 100% outside air system for various <br />healthcare and pharmaceutical applications. Mr. Sheth has had large exposure to design of various <br />types of occupancies like office spaces, city halls, auditoriums, hospitals, medical office buildings, <br />laboratories, educational and commercial restaurants. <br />Relevant Experience: <br />• City Of Simi Valley (Prime Consultant): Upgrade of existing HVAC system for city hall and DMV <br />building (Double deck AHU upgrade with title 24 compliance and upgrade of existing air <br />distribution system. Pneumatic to DDC controls). A federally funded project (ARRA Stimulus). <br />■ DEA - Los Angeles - 40,000 SF TI for existing Federal Facility. <br />• 16th Floor Wilshire - Energy Upgrade replacing existing double deck AHUs and CAV system with <br />energy efficient VAV system along with brand new loop air distribution system. <br />■ IWBT (Interim West Bus Terminal): Design of waiting area building (50,000 SF) adjacent to Bradley <br />international terminal at AX. LEED silver project. <br />■ Fess Parker Waterfront Hotel: 5 star hotel with 200 guest rooms, ball room, spa, commercial <br />kitchen, auditorium, indoor swimming pool, lounges and multipurpose spaces. Approximately <br />200,000 SF of conditioned space. <br />• Design of various office Tls for Haven Pointe, Rancho Cucamonga. <br />■ Various large and mid -size Tls for American Career College in Long Beach and Anaheim <br />campuses, <br />• Owner's representative for American Career College for their Texas and Florida campuses. <br />■ USC ophthalmology TI in city of Arcadia. <br />• AHU replacement for USC - McKibben Hall. <br />• Various tenant improvement projects at USC's Health science campus, Los Angeles, CA. <br />clay or Santa Ana- RFP <br />I • 2 5 ,4W Page 32 <br />