Laserfiche WebLink
Efrain Gonzalez <br />EXPERIENCE <br />17 Total, 5 with Firm <br />EDUCATION <br />BS, Mechanical Engineering, CA State <br />University Los Angeles <br />*IMEG <br />Mechanical Design Engineer <br />Efrain has been involved in the mechanical engineering field for more <br />than 16 years. His experience encompasses selection, design and layout <br />of HVAC systems; performing cooling and heating load calculations; <br />providing Title 24 energy compliance analyses, cost estimates, value <br />engineering, specification writing, and construction support. Efrain has <br />designed HVAC systems for medical and laboratory facilities, office <br />buildings, and data centers, schools, and various public work facilities. <br />19*11141:1A9* 1»*1141'19: <br />City of Irvine, CA <br />• Rancho Senior Center HVAC [5 Packaged Units] and Fire Sprinkler System <br />Replacement <br />Orange County Public Works Department, CA <br />OC Public Libraries, HVAC Replacement and Infrastructure Upgrades <br />• AIiso Viejo Branch, (ChOerandThermal Energy Storage Replacement) <br />• Laguna Beach Branch <br />• Los Alamitos/Rossmoor Branch <br />• Rancho Santa Margarita Branch <br />Additional County Facilities <br />• HVAC and Chiller Replacement, HCA Clinic <br />• HVAC Replacement, OC Courthouse Building <br />• AHU Replacements (4), County Operations Center <br />• Chiller and Cooling Tower Replacement, Probation Ofice <br />• 1st and 6th Floor Box Replacements, Brad Gates Building <br />Orange County Sherrifs Department, CA <br />• Chiller Replacement, Theo Lacy Facility <br />• Boiler Replacement, Theo Lacy Facility <br />• Remodel, Research & Development Offices <br />• 4th Floor Remodel, PSD, Brad Gates Building <br />• 5th Floor Remodel, CWR, Brad Gates Building <br />25G-428 <br />