Korey Kowata
<br />*IMEG
<br />Plumbing Design Engineer
<br />Korey's vast experience in the mechanical engineering industry includes
<br />specializing in plumbing and HVAC design for municipal, education
<br />commercial and healthcare facilities. His design experience includes
<br />new and existing. Korey is responsible for overseeing projects from
<br />design through construction, research and application of building,
<br />mechanical, plumbing, and fire protection codes, calculations, equipment
<br />selection, sizing, project scheduling, specification writing, and punch list
<br />observations.
<br />EXPERIENCE PROJECT EXPERIENCE
<br />24Total, 13 with Firm
<br />EDUCATION Caltrans District 12 Building, Irvine, CA
<br />Cal Poly Pomona University, BS • New UPS System, Emergency Sanitary Tank, Emergency Water Tank
<br />Mechanical Engineering
<br />City of San Clemente, CA
<br />• New 20,000-sf Fire Station and Senior Center: $4.3M
<br />City of Irvine, CA
<br />• Rancho Senior Center HVAC (5 Packaged Units) and Fire Sprinkler System
<br />Replacement (Bidding)
<br />Orange County Sheriff -Coroner's Department (OCSD)
<br />• 423,873-sf Infrastructure Assessment, Central Jail Complex
<br />• DDC System Installation, Men's Central Jail, Women's Central Jail, Intake/
<br />Release Center: $1.2M
<br />• HVAC Renovation, Katella Shooting Range: $250,000
<br />• Kitchen Renovation, Men's Central Jail
<br />• Pod A Flood Protection, Theo Lacy Facility: $95,000
<br />• Chiller Replacement, Theo Lacy Facility
<br />Orange County Public Works Department, CA
<br />• HVAC and Dehumdification Systems Installation, Modjeska House: $120,000
<br />• Utility Feasibility Study, County Operations Center
<br />• AHU Replacements (4), County Operations Center
<br />• HVAC and Chiller Replacement, HCA Clinic: $400,000
<br />• AHU Replacement, (2) Juvenille Hall
<br />• HVAC Replacement, OC Courthouse Building
<br />• Chiller and Cooling Tower Replacement, Probation Ofice
<br />• 1 stand 6th Floor Box Replacements, Brad Gates Building
<br />• County's BMS System Evaluation
<br />Central Utility Facility
<br />• Cogeneration Study
<br />• Seismic Evaluation (Cooling Tower)
<br />• Boiler and Electric Steam Turbine Water Pump Study and Installation:
<br />$165,000
<br />OC Public Libraries Branches, HVAC Replacement and Infrastructure Upgrades
<br />• Aliso Viejo Branch: $300,000 (Choerand Thermal Energy storage Replacement)
<br />• Laguna Beach Branch: $313,000
<br />• Los Alamitos/Rossmoor Branch: $350,500
<br />• Rancho Santa Margarita Branch: $400,000
<br />25G-430
<br />
|