My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25D - AGMT FOR RIGHT OF WAY ON-CALL
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
12/15/2020
>
25D - AGMT FOR RIGHT OF WAY ON-CALL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2020 4:44:09 PM
Creation date
12/10/2020 4:37:24 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25D
Date
12/15/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 01 C1 DA1 D-6C6A-4608-A484-D928555169F0 <br />City of Santa Ana Public Works <br />OPC Water Resources Right of Way Acquisition Services I, PAGE zz <br />e. Project Experience / f. References <br />The next pages outline our experience providing similar services for public sector clients, with <br />references and year completed. <br />1 LA DEPT. OF WATER & POWER, RIVER SUPPLY CONDUIT IMPROVEMENT <br />The River Supply Conduit Improvement Upper <br />Reach (RSCIUR) was an improvement to Unit <br />7 and consisted of installing 13,255 linear feet <br />of 78-inch diameter pipeline, primarily within the <br />tunnel. LADWP tasked OPC with acquiring 74 <br />easements for the project. We completed the <br />acquisitions on time and within budget. <br />The project replaced <br />approximately 30,000 linear <br />feet of the RSC that runs <br />between North Hollywood <br />Pump Station and the <br />Headworks Spreading <br />Grounds site with a larger <br />diameter steel pipe. <br />The original River Supply Conduit (RSC) was built <br />in the 1940's and responsible for transporting YEAR COMPLETED: 2019 <br />substantial amounts of water from the Northeast <br />Valley to the Central City area in the Los Angeles <br />region. <br />1 <br />Ron Davis <br />Sr. Real Estate <br />Officer <br />LOS ANGELES <br />DEPARTMENT OF <br />WATER & POWER <br />Tel: 213.367.0557 <br />Ron.Davis <br />@ladwp.com <br />SAN DIEGO COUNTY WATER AUTHORITY, PIPELINE 3 RELINING PROJECT <br />This project rehabilitated approximately four <br />miles of Pipeline 3 between Lake Murray and <br />Sweetwater Reservoir in San Diego County. <br />The Authority Relined the pipeline by excavating <br />25-foot-by-60-foot sections and installing steel <br />liners through the length of the pipe. Most <br />construction activities occurred at these access <br />portals, which the County spaced approximately <br />525 to 2,500 feet apart. SDCWA tasked OPC to <br />perform acquisition services for workspace and <br />laydown yards for the portals through residential/ <br />commercial areas. <br />There were approximately <br />21 properties affected by <br />this project. The SDCWA <br />also rehabilitated existing <br />pipeline access structures <br />as part of this project. <br />YEAR COMPLETED: <br />2017 <br />F <br />Nick Von Gymnich <br />Sr. R/WAgent <br />SAN DIEGO <br />COUNTY WATER <br />AUTHORITY <br />Tel: 858.522.6910 <br />NvonGymnich <br />@sdcwa.org <br />e. Project Experience/f. References Ives Through Infrastructure <br />t6vIs� opcservlces.com :AD 0 r C <br />
The URL can be used to link to this page
Your browser does not support the video tag.