Laserfiche WebLink
41" AND CABRILLO <br />WATER SUPPLY ASSESSMENT <br />AUGUST 21, 2020 <br />7. TECHNICAL APPENDICES <br />Appendix A— Proposed Project Water Demand Calculations <br />Appendix B — Landscape Water Efficiency Ordinance No. 6355 <br />Appendix C — SGMA Basin 8-1 Alternative Plan <br />FUSCOE ENGINEERING, INC. 55D-37 2() <br />